Researched November 9, 2026
Data centers in Texas
Spezia tracks 187 data center projects in Texas: 74 under construction, 10 approved, 65 announced, 11 operating, 27 with no stated status. The 43 active projects that state a size add up to 51.56 GW.
- Under construction74
- Approved10
- Announced65
- Operational11
- Unknown27
- 3 projects with FAA crane filings
- 11 projects with EPA construction stormwater coverage
- 2 projects with an EPA air permit
Most projects: El Paso (17), Amarillo (9), Abilene (7), Houston (7), Hubbard (5), Milam County (5), Red Oak (5), Afton (4).
Every tracked project in Texas
Being built first, then by stated size. Open a project for its sources, its public records and what is known about who is on the job.
- Matrix Data Center CampusUnder constructionSulphur SpringsMSB Global Services, LLC3 GW
- MSB Matrix Data Center CampusUnder constructionSulphur SpringsMSB Global Services3 GW
- Crusoe Energy West Texas Data Center ProjectsUnder constructionTown not statedCrusoe Energy2.5 GW
- Crusoe Abilene AI CampusUnder constructionAbileneCrusoe2.1 GW
- Vantage Data Centers Hyperscale Campus in Shackelford County, TexasUnder constructionTown not statedVantage Data Centers1.4 GW
- CloudBurst San MarcosUnder constructionSan MarcosCloudBurst Data Centers1.2 GW
- OpenAI Stargate Milam County Data CenterUnder constructionTown not statedSB Energy1.2 GW
- Stargate Milam "Freebird"Under constructionTown not statedSB Energy1.2 GW
- Stargate Milam CountyUnder constructionMilam CountySB Energy1.2 GW
- Stargate Milam County (SB Energy)Under constructionMilanoDeveloper not named1.2 GW
- Stargate Texas data center (Milam County)Under constructionMilam CountySB Energy1.2 GW
- Beacon Point AI Data Center CampusUnder constructionTown not statedHut 81 GW
- Childress AI data center campusUnder constructionChildressCrusoe1 GW
- El Paso AI data center campusUnder constructionEl PasoMeta1 GW
- El Paso data center campusUnder constructionEl PasoMeta1 GW
- Meitner Energy CenterUnder constructionTown not statedGoogle1 GW
- Meta data center campus in El Paso, TexasUnder constructionEl PasoMeta1 GW
- Meta data center in northeast El PasoUnder constructionEl PasoMeta1 GW
- Meta El Paso AI Data Center CampusUnder constructionEl PasoMeta1 GW
- Northeast El Paso data centerUnder constructionEl PasoMeta1 GW
- Stargate Milam County Data Center (Freebird)Under constructionBurlingtonOpenAI1 GW
- Stargate AbileneUnder constructionAbileneCrusoe900 MW
- CyrusOne Fairfield Data Center CampusUnder constructionFairfieldCyrusOne760 MW
- Beacon PointUnder constructionNueces CountyHut 8704 MW
- Project CaprockUnder constructionAbernathyAligned Data Centers540 MW
- DataBank Red Oak Data Center CampusUnder constructionRed OakDataBank480 MW
- CyrusOne Bosque County Campus (Thad Hill Energy Center)Under constructionTown not statedCyrusOne400 MW
- CyrusOne Freestone County data center campusUnder constructionFairfieldCyrusOne380 MW
- Hut 8 Beacon Point AI CampusUnder constructionRobstownHut 8352 MW
- Hueco RanchUnder constructionDesert HavenKaufman & Company350 MW
- Nueces County data centerUnder constructionNueces CountyHut 8350 MW
- Rowan Digital Infrastructure Temple Texas Campus 2nd BuildingUnder constructionTempleRowan Digital Infrastructure300 MW
- Core Scientific Denton Data CenterUnder constructionDentonCore Scientific260 MW
- CyrusOne Bosque County campusUnder constructionWhitneyCyrusOne190 MW
- The RockUnder constructionRound RockSwitch185 MW
- Coravel Dallas-Fort Worth campusUnder constructionDallas-Fort WorthCoravel140 MW
- Lambda Data Center Project in PlanoUnder constructionPlanoAligned Data Centers72 MW
- Project Kati 1Under constructionTown not statedSoluna Holdings, Inc.12 MW
- Abilene AI ParkUnder constructionAbileneCrusoeSize not stated
- Advanced Manufacturing and Data Center Infrastructure FacilityUnder constructionHoustonDeveloper not namedSize not stated
- Advanced manufacturing electrical projectUnder constructionHoustonDeveloper not namedSize not stated
- Anthropic data center campus in Hubbard, TexasUnder constructionHubbardNexus Data CentersSize not stated
- Armstrong County data center campusUnder constructionAmarilloCrusoeSize not stated
- Armstrong County Google data center campusUnder constructionTown not statedCrusoeSize not stated
- AWS GW RanchUnder constructionTown not statedAmazon AWSSize not stated
- confidential data center customer in HoustonUnder constructionHoustonDeveloper not namedSize not stated
- CTX Houston campusUnder constructionHoustonServerfarmSize not stated
- CTX1 Data CenterUnder constructionHoustonServerfarmSize not stated
- CTX2Under constructionHoustonServerfarmSize not stated
- CyrusOne DFW20A - FairfieldUnder constructionFairfieldCyrusOneSize not stated
- CyrusOne Fort Worth data center campusUnder constructionFort WorthCyrusOneSize not stated
- CyrusOne Thad Hill Energy Center Data Center CampusUnder constructionTown not statedCyrusOneSize not stated
- DFW10Under constructionWhitneyCyrusOneSize not stated
- DFW11Under constructionWhitneyCyrusOneSize not stated
- DFW9Under constructionRed OakDataBankSize not stated
- FreebirdUnder constructionMilam CountySB EnergySize not stated
- Freebird Data Center Phase 1Under constructionBurlingtonDeveloper not namedSize not stated
- Galaxy Digital HeliosUnder constructionAftonGalaxy DigitalSize not stated
- Google AI data center campus / Project LlanoUnder constructionClaudeCrusoeSize not stated
- Google Amarillo Data Center CampusUnder constructionAmarilloCrusoeSize not stated
- Google Armstrong County Data CenterUnder constructionAmarilloCrusoeSize not stated
- Haskell County projectUnder constructionTown not statedGoogleSize not stated
- Horizon 1Under constructionTown not statedAironSize not stated
- Horizon 4Under constructionTown not statedAironSize not stated
- Journey 2A data center buildingUnder constructionTown not statedGoogleSize not stated
- Lake Whitney CyrusOneUnder constructionLake WhitneyCyrusOneSize not stated
- Meta data center complexUnder constructionEl PasoMetaSize not stated
- Nexus Data Centers Hubbard campusUnder constructionHubbardNexus Data CentersSize not stated
- Nexus Data Centers Hubbard, Texas AI data centerUnder constructionHubbardNexus Data CentersSize not stated
- Project SeafoxUnder constructionEl PasoMetaSize not stated
- QTS Fort Worth Data CenterUnder constructionFort WorthQTSSize not stated
- second 900MW data centre in AbileneUnder constructionAbileneCrusoeSize not stated
- Shackelford County Stargate siteUnder constructionTown not statedOracleSize not stated
- Stargate ShackelfordUnder constructionTown not statedVantageSize not stated
- GW RanchApprovedTown not statedPacifico Energy Group7.65 GW
- GW Ranch Energy CenterApprovedTown not statedPacifico GW7.65 GW
- McCloud facilityApprovedTown not statedEl Paso Electric366 MW
- Galaxy Helios data center Phase 2ApprovedAftonGalaxy260 MW
- Blueprint Taylor Data CenterApprovedTaylorBlueprint Projects60 MW
- Compass Datacenters - DFWIII-III - Building 10 - Interior / Tenant Fit OutApprovedRed OakCompass Datacenters DFW III-I LLCSize not stated
- Crusoe-Microsoft Abilene AI Factory ExpansionApprovedAbileneCrusoe EnergySize not stated
- Google West Texas campusesApprovedTown not statedGoogleSize not stated
- PECOS COUNTY DATA CENTERApprovedFort StocktonAMAZON DATA SERVICES, INCSize not stated
- Project Gold Phase 2 - DFW39ApprovedGarlandDigital RealtySize not stated
- Thunderhead gas-fired plant in Winkler CountyAnnouncedTown not statedThunderhead Energy Solutions5 GW
- Fort Bliss Data CenterAnnouncedFort BlissCarlyle Group3 GW
- Project KilbyAnnouncedPecosJoulent2.67 GW
- Chevron and Microsoft off-grid data center complexAnnouncedTown not statedChevron2.5 GW
- Microsoft Pecos data center campusAnnouncedPecosMicrosoft2 GW
- Pecos data center campusAnnouncedPecosMicrosoft2 GW
- Anthropic Texas campus (Hubbard)AnnouncedHubbardNexus Data Centers1.6 GW
- Vantage DC Abilene - TX3 - Project FrontierAnnouncedAbileneVantage Data Centers1.4 GW
- Milam County data centre projectAnnouncedMilam CountyOpenAI1.2 GW
- Stargate data center in Milam County, TexasAnnouncedTown not statedSB Energy1.2 GW
- Stargate datacenter campus in Milam County, TexasAnnouncedTown not statedSB Energy1.2 GW
- Childress campusAnnouncedChildressCrusoe1 GW
- Childress County data center campusAnnouncedTown not statedLancium Technologies1 GW
- MeitnerAnnouncedTown not statedGoogle1 GW
- Meta Data Center Campus (El Paso, Texas)AnnouncedEl PasoMeta Platforms, Inc.1 GW
- Meta Data Center Campus in El PasoAnnouncedEl PasoMeta Platforms, Inc.1 GW
- Meta El Paso Data CenterAnnouncedEl PasoMeta Platforms1 GW
- Project Sopaipilla HoldingsAnnouncedEl PasoMeta1 GW
- Corsicana data center campusAnnouncedCorsicanaRiot Platforms910 MW
- Crusoe 900 MW facility for MicrosoftAnnouncedTown not statedCrusoe900 MW
- Stargate El Paso areaAnnouncedEl PasoDeveloper not named800 MW
- Rowan Green Data Temple campusAnnouncedTempleRowan Green Data500 MW
- Cedar Creek gas-fired data center facilityAnnouncedCedar CreekBlackChamber Partners490 MW
- McCloud plantAnnouncedTown not statedEl Paso Electric366 MW
- Hut 8 Texas data center (Nueces County)AnnouncedTown not statedHut 8350 MW
- Nscale Ward County campusAnnouncedWard CountyNscale275 MW
- Thunderhead 250-megawatt plant in Ector CountyAnnouncedTown not statedThunderhead Energy Solutions250 MW
- Project MatadorAnnouncedAmarilloFermi222 MW
- Lancium Clean Campus AbileneAnnouncedAbileneCrusoe Energy Systems200 MW
- West Texas data center campusAnnouncedTown not statedZone Frontier Inc.200 MW
- Bosque County data centerAnnouncedTown not statedEnergy Capital Partners (ECP) and KKR190 MW
- Abernathy Joint VentureAnnouncedAbernathyFluidstack168 MW
- Amarillo, Texas data centerAnnouncedAmarilloCrusoe EnergySize not stated
- Amazon Pecos County AI campusAnnouncedTown not statedAmazonSize not stated
- AUS01AnnouncedLockhartPrime DCSize not stated
- AUS02AnnouncedLockhartPrime DCSize not stated
- Crow Holdings / CleanArc Data Centers StemmonsAnnouncedTown not statedCrow HoldingsSize not stated
- Crusoe AI data center in TexasAnnouncedTown not statedCrusoeSize not stated
- Crusoe data center campus in Jayton, TexasAnnouncedJaytonCrusoeSize not stated
- Crusoe data center for Google near AmarilloAnnouncedAmarilloCrusoeSize not stated
- Data Foundry data center in AustinAnnouncedAustinData FoundrySize not stated
- Google data center campus in Armstrong CountyAnnouncedAmarilloCrusoeSize not stated
- Google data center campus in Armstrong County, TexasAnnouncedAmarilloCrusoeSize not stated
- Google data center in Wilbarger County, TexasAnnouncedTown not statedGoogleSize not stated
- Google Texas Data CenterAnnouncedAmarilloCrusoeSize not stated
- Google Wilbarger County data center campusAnnouncedTown not statedGoogleSize not stated
- Hall County data center projectAnnouncedTown not statedLanciumSize not stated
- Jayton data center campusAnnouncedJaytonCrusoeSize not stated
- Lancium Clean Campus in Hall County, TexasAnnouncedTown not statedLanciumSize not stated
- Meta AI-enabled data center in Northeast El PasoAnnouncedEl PasoMetaSize not stated
- Meta's El Paso data center campusAnnouncedEl PasoMetaSize not stated
- Milam County data centre siteAnnouncedMilam CountySB EnergySize not stated
- Nexus Data Centers Hubbard, Texas campusAnnouncedHubbardNexus Data CentersSize not stated
- Project HyperAnnouncedChildressCrusoeSize not stated
- Project KirbyAnnouncedTown not statedChevronSize not stated
- Project RangerAnnouncedTempleRowan Digital InfrastructureSize not stated
- Project SaltworksAnnouncedGrahamStream Data Centers affiliateSize not stated
- Project StampedeAnnouncedTempleRowan Digital InfrastructureSize not stated
- Project TomahawkAnnouncedProsperWhite Rose PartnersSize not stated
- QTS AI Data Center Campus – Lancium Clean CampusAnnouncedTown not statedQTS Data CentersSize not stated
- QTS and Lancium data center campus in Hall County, TexasAnnouncedTurkeyQTSSize not stated
- QTS Turkey Data Center CampusAnnouncedTurkeyQTS Data CentersSize not stated
- Riot Platforms Rockdale data center campusAnnouncedRockdaleRiot PlatformsSize not stated
- Skybox Data Centers Wichita FallsAnnouncedWichita FallsSkybox Data CentersSize not stated
- Turkey data center campusAnnouncedTurkeyQTSSize not stated
- Sweetwater campusOperationalSweetwaterIREN2 GW
- Galaxy Helios Data Center CampusOperationalAftonGalaxy1.6 GW
- OpenAI Stargate MilamOperationalTown not statedSB Energy1.2 GW
- Helios Data Center CampusOperationalTown not statedGalaxy Digital Inc.800 MW
- Iren Data CenterOperationalTown not statedDeveloper not named750 MW
- Quantum Clean Energy ProjectOperationalTown not statedIntersect Power640 MW
- Cash America Data CenterOperationalFort WorthCash America InternationalSize not stated
- Compass Datacenters Red Oak campusOperationalRed OakCompass DatacentersSize not stated
- Data Center - DallasOperationalDallasDeveloper not namedSize not stated
- DFW1OperationalDallasDataBankSize not stated
- Galaxy's Helios Data CenterOperationalAftonGalaxySize not stated
- Microsoft Pecos Data Center Campus (Project Kilby)UnknownPecosMicrosoft2.5 GW
- CloudBurst Central Texas Flagship CampusUnknownTown not statedCloudBurst Data Centers1.2 GW
- Meta-BlackRock El Paso Data Center CampusUnknownEl PasoMeta Platforms1 GW
- Milam County Stargate siteUnknownTown not statedSB Energy / SoftBank1 GW
- Canadian Breaks Data CenterUnknownTown not statedDeveloper not named430 MW
- Cinco data centerUnknownTown not statedRowan Digital Infrastructure300 MW
- Cedarvale 2 Data Mining FacilityUnknownTown not statedDeveloper not namedSize not stated
- Confidential Client Data CenterUnknownDallasDeveloper not namedSize not stated
- confidential North Texas data center campusUnknownTown not statedDeveloper not namedSize not stated
- confidential technology client project in Central TexasUnknownTown not statedDeveloper not namedSize not stated
- CyrusOne Westover Hills Data CenterUnknownSan AntonioCyrusOneSize not stated
- DA12 Data Center CampusUnknownDallasEquinix, Inc.Size not stated
- Fisk Electric data center manufacturing facilityUnknownHoustonDeveloper not namedSize not stated
- Flexential TaltyUnknownTaltyFlexentialSize not stated
- Google Amarillo-area campusUnknownTown not statedCrusoeSize not stated
- HRL1 & Fluidstack-2 Data CenterUnknownAbernathyFluidStackSize not stated
- Meta AI-enabled facilityUnknownEl PasoMetaSize not stated
- Microsoft CastrovilleUnknownCastrovilleDeveloper not namedSize not stated
- Natural Gas Peaker Plant and Behind-the-Meter Substation for Texas Hyperscale Data Center CampusUnknownMidlothianDeveloper not namedSize not stated
- Nscale Ward County, Texas projectUnknownTown not statedNscaleSize not stated
- Oncor Grand Prairie Hyperscale Substation for DFW Cloud CampusUnknownGrand PrairieDeveloper not namedSize not stated
- Oncor Red Oak Hyperscale Substation for DFW Data Center CampusUnknownRed OakDeveloper not namedSize not stated
- Salt Creek Mining FacilityUnknownTown not statedDeveloper not namedSize not stated
- Skybox Austin 1UnknownPflugervilleSkybox DatacentersSize not stated
- Texas Data Center Construction Project (Phase 1)UnknownTown not statedDeveloper not namedSize not stated
- University of Texas Data Center RenovationUnknownTown not statedDeveloper not namedSize not stated
- Vantage TX21 Data CenterUnknownSan AntonioVantageSize not stated
Who is building and supplying the Texas projects
- Named builders and suppliersThe general contractor, trades and equipment suppliers named on each Texas project, and which roles are still open.Ultra
- Buying stage by tradeWhat each trade is likely buying on each job now.Ultra
- ContactsSenior people at the companies on each job, where public pages name them.Ultra
- Who pays whomEquity, loans, leases, power deals and equipment orders, each with its source.Ultra
- AlertsAn email the day a Texas project you watch moves, plus a weekly roundup.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Get the active Texas projects in your inbox.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.
Get the projects that moved, every Tuesday
Free. New projects, stage changes, contract awards, power deals and local opposition across the U.S., each with its source, plus the projects that moved on Spezia's tracker. One click to unsubscribe.
Questions about data centers in Texas
How many data center projects are in Texas?
Spezia tracks 187 data center projects in Texas: 74 under construction, 10 approved, 65 announced, 11 operating, 27 with no stated status. Projects found in public sources only; a campus counts once.
Where are data centers being built in Texas?
The most projects are in El Paso (17), Amarillo (9), Abilene (7), Houston (7).
What is the largest data center project in Texas?
By the size its sources state, GW Ranch, at 7.65 GW, approved.
How many data centers are under construction in Texas?
74 projects are under construction and 10 more are approved. 13 projects here have an FAA crane filing or an EPA permit on record.
Data centers in other states
- Ohio 60
- Virginia 47
- Arkansas 40
- Mississippi 38
- Georgia 35
- Wyoming 35
- Nevada 30
- California 28
- Indiana 28
- Louisiana 28
- Oklahoma 26
- Pennsylvania 25
- Alabama 24
- Arizona 24
- Kentucky 24
- Colorado 23
- North Dakota 22
- West Virginia 22
- Missouri 21
- Tennessee 21
- Minnesota 19
- Oregon 19
- Illinois 17
- Michigan 17
- Idaho 16
- Utah 16
- New York 15
- South Carolina 15
- Wisconsin 15
- Iowa 14
- New Jersey 14
- North Carolina 14
- New Mexico 13
- Florida 11
- Kansas 8
- South Dakota 8
- Washington 7
- Maryland 6
- Montana 6
- Nebraska 5
- Massachusetts 3
- Connecticut 1