DataBank Red Oak Data Center Campus
Data center project in Red Oak, Texas
DataBank Red Oak Data Center Campus is a data center project in Red Oak, Texas, under construction, developed by DataBank, with a stated size of 480 MW. Last reported October 26, 2026, from 21 sources.
- Status
- Under construction
- Developer
- DataBank
- Location
- Red Oak, Texas
- Stated size
- 480 MW
- Last reported
- ·
- Sources
- 21 sources
- Other companies on the job
- 20 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
FAA crane filings
2 filings
Latest work from October 20, 2025 to February 2, 2026, up to 200 feet.
- Crane 2025-ASW-11484-OE ↗ · work October 20, 2025 to February 2, 2026 ·
- Crane 2025-ASW-11487-OE ↗ · work October 20, 2025 to February 2, 2026 ·
EPA construction stormwater
1 permit, 1 active
Coverage since September 1, 2026. A site of an acre or more needs this before grading starts.
- EPA record ↗ · Active ·
1 operator named on the permits, on Ultra.
Permits and filings
- Rezoning from PD-164 to PD-164R1 for data center complexZoning · City of Red Oak, Texas · Approved · ecode360.com ↗
- DFW10 interior build-out registrationPublic record · Texas Department of Licensing and Regulation · Filed · elliscountypress.com ↗
- $2 billion construction loan for first three buildingsPublic record · theaiconsultingnetwork.com ↗
- $1.45 billion financing including Red Oak upsizePublic record · datacentermap.com ↗
What the sources say
Reported
“DataBank: Red Oak. $2B closed in April, the largest financing in company history.”
Reported
“DataBank has secured a $2 billion loan to accelerate construction of a major data center campus in Red Oak, Texas”
Status
“with construction already underway”
Size
“three data center facilities totaling 600,000 square feet and 180 megawatts of capacity”
Reported
“DataBank locked in a $2 billion construction loan to jump-start the first phase of its massive data center campus in Red Oak”
Status
“State filings indicate interior work is poised to begin on two of the buildings.”
Size
“The buildings — dubbed DFW 9, DFW 10 and DFW 11 — total about 600,000 square feet and 180 megawatts of power”
Reported
“construct three data center buildings in Red Oak, a suburb 20 miles outside Dallas”
Square footage
425,170 square feet
Acreage
292 acres
Address
3330 Batchler Rd, Red Oak, TX 75154
Construction start
February 2025
Completion
January 2027
Phase 1 ready for service
Q2 2026
Interior build-out cost
$301 million
Reports behind this page
- Texas Data Center Projects Face Grid Connection Pause | Greg Moodie 发布的此话题相关的动态 | 领英 - 跳到主要内容 · linkedin.com ·
- DataBank Secures $2B Loan for Texas Data Center Campus | PRESWERX TRENDS OF TEXAS 发布的此话题相关的动态 | 领英 · linkedin.com ·
- Dallas firm snaps up $2B construction loan for Red Oak data center build-out · therealdeal.com ·
- Report from businessinsider.com · businessinsider.com ·
What the full file adds
- General contractor2 named
- Electrical contractor1 named
- Mechanical contractorOpen: not named yet
- Engineering and commissioning1 named
- Power and cooling equipmentOpen: not named yet
- Utility and power supply2 named
- Tenant1 named
- Investors and lenders11 named
- Named builders, suppliers and partners20 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom14 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Red Oak and Texas
- DFW9Under constructionSame town · Red OakDataBankSize not stated
- Compass Datacenters - DFWIII-III - Building 10 - Interior / Tenant Fit OutApprovedSame town · Red OakCompass Datacenters DFW III-I LLCSize not stated
- Compass Datacenters Red Oak campusOperationalSame town · Red OakCompass DatacentersSize not stated
- Oncor Red Oak Hyperscale Substation for DFW Data Center CampusUnknownSame town · Red OakDeveloper not namedSize not stated
- GW RanchApproved · Town not statedPacifico Energy Group7.65 GW
- GW Ranch Energy CenterApproved · Town not statedPacifico GW7.65 GW
Get every active project in Texas.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.