Skip to content
On-site power trackerUltra

See which data centers build their own power plants, and whose turbines are inside.

The power plants data centers build for themselves, behind the meter: every gas turbine, engine and fuel cell by maker, model and count, with its capacity, its status and the permit or filing that names it. Built for the sales teams of equipment makers, and for the developers, contractors and lenders around these plants.

Part of Ultra. A free account opens the whole build-out 3 days a month, so you can see it before you pay. Compare plans

See it first

The build-out right now

Real output from Spezia, read from the same data the tool uses. Every line links to its source.

The build-out right nowLive · checked Nov 9, 2026
U.S. projects tracked
1,047
Approved or under construction
408
Capacity on those projects
204.6 GW
States with active projects
41
By stage
  • Announced343
  • Approved118
  • Under construction290
  • Operational91
  • Blocked or paused27
Most active states
  • TX84 active
  • VA25 active
  • IN20 active
  • MS15 active
  • CO14 active

1,047 project files, with owners, builders and trades, are inside.

Continue free →

Free account, no card. A free account previews On-site power tracker before you choose a plan.

Counts from the latest weekly research run. Project files, owners, builders and trades are inside the Ultra plan.

What you get

  • Every unit, by maker and model

    The turbines, engines and fuel cells at each plant, counted from the air permit, filing or announcement that names them, with its words quoted.

  • Who is winning the orders

    Megawatts by maker, split into operating, under construction, permitted and announced, so you see each maker's share and where it is growing.

  • Tied to the data center

    Each plant is matched to the tracked project it powers, so the owner, the builders and the rest of the project file are one click away.

How it works

  1. 1Open on-site power.
  2. 2Read capacity by maker, then the plants and their units.
  3. 3Open a plant's permit or filing, or the project file of the data center it powers.

Who uses it

Questions about On-site power tracker

Where do the unit counts come from?

Air permits and permit applications, regulator filings, company announcements and trade press, searched every week. A count is kept only when its document states the number and names the model or the maker, and the quote is shown with a link to the document. Where two documents disagree, a permit or filing wins over the press, and the other count is shown too.

How is the capacity worked out?

From the megawatts the document gives for each unit. When it gives none, from the maker's own published rating for that model, and the page says which. Backup diesel generators are left out: only the machines that make the plant's power count.

Which plan includes it?

Ultra, with the rest of the build-out. A free account opens the whole build-out 3 days a month.

Often used with

  • 800+ U.S. data center projects: who is involved and which trades are buying now.

    See it live
  • Planned plants, the grid connection queues and the power gap in each state.

    See it live
  • Every tracked project on the map, by stage and size.

    See it live

See which data centers build their own power plants, and whose turbines are inside.

Part of Ultra. A free account opens the whole build-out 3 days a month, so you can see it before you pay.

Open on-site power