Skip to content

Researched November 9, 2026

Data center projects in the United States

Spezia tracks 1,047 data center projects in 43 states, from announcement to operation. Every project has its own page with its status, developer, stated size and the reports and public records behind it.

projects tracked
1,047
approved or under construction
408
stated size of the 223 active projects that give one
204.6 GW
with an FAA crane filing or EPA permit on record
79
By status

Where each project stands

  • Under construction290
  • Approved118
  • Announced343
  • Operational91
  • Blocked or paused27
  • Unknown178

A campus counts once, however many buildings it has. Announced is not built, and each page says which stage the sources show.

Alabama: 24 tracked projectsNo tracked projectsArizona: 24 tracked projectsColorado: 23 tracked projectsFlorida: 11 tracked projectsGeorgia: 35 tracked projectsIndiana: 28 tracked projectsKansas: 8 tracked projectsNo tracked projectsMassachusetts: 3 tracked projectsMinnesota: 19 tracked projectsNew Jersey: 14 tracked projectsNorth Carolina: 14 tracked projectsNorth Dakota: 22 tracked projectsOklahoma: 26 tracked projectsPennsylvania: 25 tracked projectsSouth Dakota: 8 tracked projectsTexas: 187 tracked projectsWyoming: 35 tracked projectsConnecticut: 1 tracked projectMissouri: 21 tracked projectsWest Virginia: 22 tracked projectsIllinois: 17 tracked projectsNew Mexico: 13 tracked projectsArkansas: 40 tracked projectsCalifornia: 28 tracked projectsNo tracked projectsNo tracked projectsNo tracked projectsIowa: 14 tracked projectsKentucky: 24 tracked projectsMaryland: 6 tracked projectsMichigan: 17 tracked projectsMississippi: 38 tracked projectsMontana: 6 tracked projectsNo tracked projectsNew York: 15 tracked projectsOhio: 60 tracked projectsOregon: 19 tracked projectsTennessee: 21 tracked projectsUtah: 16 tracked projectsVirginia: 47 tracked projectsWashington: 7 tracked projectsWisconsin: 15 tracked projectsNebraska: 5 tracked projectsSouth Carolina: 15 tracked projectsIdaho: 16 tracked projectsNevada: 30 tracked projectsNo tracked projectsLouisiana: 28 tracked projectsNo tracked projects
Tracked projects by state, all stages. Press a state to open its page.

The largest operating projects

Operating campuses Spezia tracks, by stated size.

Public records

Which projects are really moving

A press release is not a building. Each project page also shows the public records that only a real site produces, each linked to the agency's own file.

  • 40 projects with crane or tall-structure filings at the FAA, which builders must file before steel goes up.
  • 41 projects with EPA construction stormwater coverage, needed before a site of an acre or more is graded.
  • 26 projects with an EPA air permit for backup generators or turbines.

FAA files read to November 6, 2026. EPA files dated November 8, 2026.

Just reported

In the news most recently

Data center projects by state

  1. 1Texas187 · 74 building
  2. 2Ohio60 · 11 building
  3. 3Virginia47 · 20 building
  4. 4Arkansas40 · 8 building
  5. 5Mississippi38 · 15 building
  6. 6Georgia35 · 6 building
  7. 7Wyoming35 · 6 building
  8. 8Nevada30 · 10 building
  9. 9California28 · 5 building
  10. 10Indiana28 · 4 building
  11. 11Louisiana28 · 10 building
  12. 12Oklahoma26 · 3 building
  13. 13Pennsylvania25 · 6 building
  14. 14Alabama24 · 7 building
  15. 15Arizona24 · 3 building
  16. 16Kentucky24 · 2 building
  17. 17Colorado23 · 6 building
  18. 18North Dakota22 · 10 building
  19. 19West Virginia22 · 1 building
  20. 20Missouri21 · 9 building
  21. 21Tennessee21 · 4 building
  22. 22Minnesota19 · 4 building
  23. 23Oregon19 · 6 building
  24. 24Illinois17 · 4 building
  25. 25Michigan17 · 1 building
  26. 26Idaho16 · 6 building
  27. 27Utah16 · 7 building
  28. 28New York15 · 2 building
  29. 29South Carolina15 · 3 building
  30. 30Wisconsin15 · 10 building
  31. 31Iowa14 · 1 building
  32. 32New Jersey14 · 7 building
  33. 33North Carolina14 · 1 building
  34. 34New Mexico13 · 7 building
  35. 35Florida11 · 1 building
  36. 36Kansas8 · 1 building
  37. 37South Dakota8
  38. 38Washington7 · 4 building
  39. 39Maryland6 · 3 building
  40. 40Montana6 · 1 building
  41. 41Nebraska5 · 1 building
  42. 42Massachusetts3
  43. 43Connecticut1
Inside Spezia

Who is building, supplying and paying for each one

These pages show what is public. A project file in Spezia adds the companies on the job and when to call them.

  • Named builders and suppliersThe general contractor, the trades, the engineers and the power and cooling gear suppliers each source names, and which roles are still open.Ultra
  • Buying stage by tradeWhat electrical, mechanical and the other trades are likely buying on each job now.Ultra
  • ContactsSenior people at the companies on each job, where public pages name them.Ultra
  • Who pays whomEquity, loans, leases, power deals and equipment orders, each with its source.Ultra
  • Video and satellite readingsHow busy a site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Alerts and exportsAn email the day a project you watch moves, and any list as a spreadsheet.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

Free sample

Get the active projects in your states.

Tell us where you work and what you sell. You get the approved and under-construction projects there with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.

How Spezia tracks data centers

  • From the sources

    Company announcements and filings, utility and regulator filings, county records and the trade press, read again every week. Every fact on a page links to where it came from.

  • From announcement to operation

    Each project carries its stage: announced, approved, under construction, operating, or blocked. The page says when it was last reported and how many sources back it.

  • Checked against public records

    FAA crane filings and EPA air and stormwater permits are matched to projects that they name, or whose owner or builder they name, and linked to the agency's record.

Get the projects that moved, every Tuesday

Free. New projects, stage changes, contract awards, power deals and local opposition across the U.S., each with its source, plus the projects that moved on Spezia's tracker. One click to unsubscribe.

Questions about U.S. data centers

How many data center projects are in the U.S.?

Spezia tracks 1,047 data center projects in 43 states: 290 under construction, 118 approved, 343 announced, 91 operating, 27 blocked or paused, 178 with no stated status. A campus counts once, however many buildings it has, and only projects found in public sources are counted.

Which state has the most data center projects?

Texas, with 187 tracked projects, 84 of them approved or under construction. Ohio is next with 60.

How many data centers are under construction?

290 tracked projects are under construction and 118 more are approved. 223 of those 408 state a size, adding up to 204.6 GW.

What is the largest data center under construction?

By the size its sources state, Creekstone Energy Delta Gigasite in Delta, Utah, at 10 GW.

What is the largest operating data center Spezia tracks?

By stated size, Sweetwater campus in Sweetwater, Texas, at 2 GW.

How do you know a project is really being built?

From public records as well as reports. 40 projects have crane or tall-structure filings with the FAA, 41 construction stormwater coverage with the EPA, and 26 an EPA air permit for generators or turbines. Each links to the agency's own record.

Why do other trackers count more data centers?

Some count every building, and some count every server room in the country. Spezia counts large projects and campuses that public sources name, from announcement to operation, and links each fact to its source.

What does a member see beyond these pages?

The builders, trade contractors, equipment suppliers, tenants and lenders named on each project, who is paying whom, what each trade is likely buying now, contacts, video and satellite readings of the site, and an alert when a project you watch moves.