Data center project in Pike County, Ohio

PORTS-Pike Technology Campus is a data center project in Pike County, Ohio, under construction, developed by SB Energy, with a stated size of 8 GW. Last reported October 30, 2026, from 52 sources.

Status
Under construction
Developer
SB Energy
Location
Pike County, Ohio
Stated size
8 GW
Stated investment
$10B
Last reported
·
Sources
52 sources
Other companies on the job
16 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • Ohio EPA wetlands and stream impacts permitEnvironmental review · Ohio EPA · datacentercensus.com ↗
  • Portsmouth Gas DevCo gas-fired generation applicationUtility filing · Ohio Power Siting Board · 26-0746-EL-BGN · Filed · suedatacenters.org ↗
  • Baku-Gavin 765 kV transmission lineUtility filing · Ohio Power Siting Board · 26-0426-EL-BTX · Filed · suedatacenters.org ↗
  • Hanging Rock-Baku 765 kV transmission lineUtility filing · Ohio Power Siting Board · 26-0870-EL-BTX · Filed · suedatacenters.org ↗
  • Piketon Area Improvements Project 765kV transmission lineUtility filing · Ohio Power Siting Board · Status not stated · aigridwatch.com ↗
  • IncentiveIncentive · Status not stated · aigridwatch.com ↗
  • Community Benefits AgreementIncentive · Status not stated · suedatacenters.org ↗

What the sources say

  • Reported

    “PORTS-Pike Technology Campus planned on the site of the former Portsmouth Gaseous Diffusion Plant”

    digital.enr.com ↗ ·

  • Size

    “The project includes a planned 10-GW data center campus bolstered by an equal amount of power generation capacity”

    digital.enr.com ↗ ·

  • Reported

    “the massive PORTS-Pike Technology Campus planned on the site of the former Portsmouth Gaseous Diffusion Plant”

    enr.com ↗ ·

  • Reported

    “the PORTS-Pike Technology Campus about 70 miles south of Columbus”

    usatoday.com ↗ ·

  • Status

    “the Pike County data center campus that broke ground earlier this year”

    usatoday.com ↗ ·

  • Planned capacity

    10 GW

    suedatacenters.org ↗ ·

  • IT load

    8 GW-IT

    datacentercensus.com ↗ ·

  • Phase 1 capacity

    800 MW

    datacentercensus.com ↗ ·

  • Acreage

    3,700 acres

    datacentercensus.com ↗ ·

  • Private farmland

    1,016 acres

    datacentercensus.com ↗ ·

  • On-site gas generation

    9.2 GW

    newswatchman.com ↗ ·

  • Construction start

    March 2026 groundbreaking

    suedatacenters.org ↗ ·

  • Completion

    Six-year buildout through 2032

    datacentercensus.com ↗ ·

  • Construction jobs

    35,000

    datacentercensus.com ↗ ·

Reports behind this page

  1. ENR • September 07, 2026 • PROJECT DELIVERY · digital.enr.com ·
  2. Report from enr.com · enr.com ·
  3. Report from usatoday.com · usatoday.com ·
Who is on this job

What the full file adds

  • General contractor2 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply4 named
  • Tenant1 named
  • Investors and lenders4 named
  • Named builders, suppliers and partners16 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom40 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Ohio

Every data center project in Ohio →
Free sample

Get every active project in Ohio.

Tell us what you sell. You get the approved and under-construction projects in Ohio and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.