Data center project in Pike County, Ohio
PORTS-Pike Technology Campus is a data center project in Pike County, Ohio, under construction, developed by SB Energy, with a stated size of 8 GW. Last reported October 30, 2026, from 52 sources.
- Status
- Under construction
- Developer
- SB Energy
- Location
- Pike County, Ohio
- Stated size
- 8 GW
- Stated investment
- $10B
- Last reported
- ·
- Sources
- 52 sources
- Other companies on the job
- 16 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
Permits and filings
- Ohio EPA wetlands and stream impacts permitEnvironmental review · Ohio EPA · datacentercensus.com ↗
- Portsmouth Gas DevCo gas-fired generation applicationUtility filing · Ohio Power Siting Board · 26-0746-EL-BGN · Filed · suedatacenters.org ↗
- Baku-Gavin 765 kV transmission lineUtility filing · Ohio Power Siting Board · 26-0426-EL-BTX · Filed · suedatacenters.org ↗
- Hanging Rock-Baku 765 kV transmission lineUtility filing · Ohio Power Siting Board · 26-0870-EL-BTX · Filed · suedatacenters.org ↗
- Piketon Area Improvements Project 765kV transmission lineUtility filing · Ohio Power Siting Board · Status not stated · aigridwatch.com ↗
- IncentiveIncentive · Status not stated · aigridwatch.com ↗
- Community Benefits AgreementIncentive · Status not stated · suedatacenters.org ↗
What the sources say
Reported
“PORTS-Pike Technology Campus planned on the site of the former Portsmouth Gaseous Diffusion Plant”
Size
“The project includes a planned 10-GW data center campus bolstered by an equal amount of power generation capacity”
Reported
“the massive PORTS-Pike Technology Campus planned on the site of the former Portsmouth Gaseous Diffusion Plant”
Reported
“the PORTS-Pike Technology Campus about 70 miles south of Columbus”
Status
“the Pike County data center campus that broke ground earlier this year”
Planned capacity
10 GW
IT load
8 GW-IT
Phase 1 capacity
800 MW
Acreage
3,700 acres
Private farmland
1,016 acres
On-site gas generation
9.2 GW
Construction start
March 2026 groundbreaking
Completion
Six-year buildout through 2032
Construction jobs
35,000
Reports behind this page
- ENR • September 07, 2026 • PROJECT DELIVERY · digital.enr.com ·
- Report from enr.com · enr.com ·
- Report from usatoday.com · usatoday.com ·
What the full file adds
- General contractor2 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply4 named
- Tenant1 named
- Investors and lenders4 named
- Named builders, suppliers and partners16 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom40 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Ohio
- PORTS AI data centerUnder construction · PiketonSB Energy10 GW
- Lordstown Stargate siteUnder construction · Town not statedSoftBank (SB Energy)1 GW
- Meta PrometheusUnder construction · New AlbanyMeta1 GW
- PrometheusUnder construction · New AlbanyMeta1 GW
- Prometheus AI data centerUnder construction · New AlbanyMeta1 GW
- PORTS Technology CampusUnder construction · PiketonSB Energy800 MW
Get every active project in Ohio.
Tell us what you sell. You get the approved and under-construction projects in Ohio and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.