Skip to content
Data center laws and local rulesUltra

Know every law, moratorium, tax break and power tariff that decides where data centers get built.

Every U.S. federal and state bill and law, county and city ordinance, moratorium, zoning rule, tax incentive, large-load power tariff and water rule that names data centers. Each one says what it does in plain words, where it stands, its dates, the states, counties and tracked projects it covers, and links to its official text. Built for developers and site teams, and for the contractors, suppliers and lenders whose jobs move with each vote.

Part of Ultra. A free account opens the whole build-out 3 days a month, so you can see it before you pay. Compare plans

See it first

The build-out right now

Real output from Spezia, read from the same data the tool uses. Every line links to its source.

The build-out right nowLive · checked Nov 9, 2026
U.S. projects tracked
1,047
Approved or under construction
408
Capacity on those projects
204.6 GW
States with active projects
41
By stage
  • Announced343
  • Approved118
  • Under construction290
  • Operational91
  • Blocked or paused27
Most active states
  • TX84 active
  • VA25 active
  • IN20 active
  • MS15 active
  • CO14 active

1,047 project files, with owners, builders and trades, are inside.

Continue free →

Free account, no card. A free account previews Data center laws and local rules before you choose a plan.

Counts from the latest weekly research run. Project files, owners, builders and trades are inside the Ultra plan.

What you get

  • Every rule in one place

    Federal and state bills and laws, county and city ordinances, moratoriums, tax incentives, power tariffs and water rules, each with what it does in plain words.

  • Where each one stands

    Proposed, moving, adopted or in force, with the dates and the quote or official record behind the status, so a vote is never a surprise.

  • Tied to the projects it covers

    County, city and utility rules are matched to the tracked projects inside them, and each project file lists the rules that apply to it.

How it works

  1. 1Open laws and local rules.
  2. 2Pick your state on the map, or filter by kind, status and what the rule does.
  3. 3Open a measure's official text, or the project files it covers.
Everything in it

Everything Ultra opens in the build-out

A free account opens all of it 3 days a month, so you can see it on your own projects before you pay. Ultra opens it every day.

  • 1,047projects tracked
  • 43states
  • 408approved or under construction
  • 79with an FAA or EPA record
  • 3,147sources cited

Counted from the public tracker, researched November 9, 2026. How each project is checked

Find the jobs worth a call

Every tracked U.S. project, filtered and ranked for where you work and what you sell.

  • Build-out overview. The U.S. AI data center build-out at a glance: projects, megawatts and what is moving.Ultra
  • Projects list and filters. Filter every project by state, stage, size, named contractors, readiness and the trade buying now.Ultra
  • Your territory. Every project in your territory ranked for your trades, buying now first, with the reason on each row.UltraTop 3 free
  • Data center map. See every tracked project on one map by stage and size, and open its file from the pin.Ultra
  • Demand by quarter. See megawatts and trade work starting by quarter and state, weighted by how likely each project is to go ahead.Ultra
  • Geography. See which states and regions are getting the build-out.Ultra
  • Trends. See how the build-out has changed over time, run by run.Ultra
  • Public U.S. data center tracker. Every tracked project on a free public page, listed by state, with status, developer, size and the records behind it.Free

Know who to call, and when

Which trade packages each project is buying now, who holds them and the people on the job.

  • Project file. One file per project: status, size, who is paying, building and supplying it, the news and every source.Ultra
  • Buying stage and contacts. Know which trade packages each project is buying now, the dated evidence, who holds each package and who to call.Ultra
  • Company dossiers and directory. Open the full file on any owner, builder or trade contractor: its projects, its money and its people.Ultra
  • Ecosystem. See who pays, who builds and who supplies the build-out, layer by layer.Ultra

Prove a project is real and moving

Public records and imagery that show a site is approved, powered and being built, each with its source.

  • Readiness signs. Four signs a project is real: utility contract, equipment orders, grid agreement and local approval, each sourced.Ultra
  • Project file filings. The zoning, site plan, permit, utility and incentive filings found for each project, with their status and source.Ultra
  • FAA crane filings. Cranes filed with the FAA at tracked sites: when steel goes up, with work dates and the builders named.Ultra
  • EPA air and stormwater permits. EPA air and stormwater permits: when generators are planned and when grading may start.Ultra
  • Site videos. How busy each site is, read from public drone and news videos, with the moment linked.Ultra
  • Satellite readings. Ground cleared and buildings rising, read from open satellite images about monthly.Ultra
  • Laws and local rules. Know every bill, law, ordinance, moratorium, tax incentive and power tariff on data centers, where it stands and which projects it covers.Ultra
  • How the tracker is made. Read how each project is researched, checked and dated, with live counts of the records behind it.Free

Power and the grid

Where the power for each project comes from, who is waiting to connect and where it is short.

  • On-site power plants. Data centers' own power plants, with every turbine, engine and fuel cell by maker and model.Ultra
  • Planned power plants. See planned power plants from the government's own inventory, matched to the data center projects beside them.Ultra
  • Grid connection queues. See every active request to connect in the PJM, MISO, SPP, CAISO and NYISO queues, by state, fuel, size and wait.Ultra
  • Power gap by state. The power gap by state: data center megawatts beside the plants due and the generation waiting.Ultra

Found money, and who pays

The tax breaks, grants and rebates your business can claim, and who is paying for each job.

  • Found money. Tax breaks, grants and rebates your business can claim from the build-out, ranked for you, with what each may be worth.Ultra
  • Who funds the build-out. Who is paying for each job: owners, tenants, investors and lenders.Ultra

Get the data into your tools

Take the projects into Excel, your CRM, your own systems or your AI agent.

  • Excel and CSV downloads. Download the projects you filtered as a spreadsheet for Excel or as CSV, for your CRM or your team.Ultra
  • REST API. Pull the project data into your own systems: list and filter projects or fetch one with its sources, as JSON.Ultra
  • Data center tools in your AI agent. Ask the AI agent you already use for projects, demand and power, read from Spezia with your key.Ultra
  • API docs and free sample. Read every field of the API and download a free sample of Virginia projects without an account.Free

Stay on top of it

What moved this week, an email when a project you watch moves, and the weekly roundup.

  • What changed. See what moved in the build-out since last week: new projects, stage changes and newly named companies.Ultra
  • Build-out news. Read permits, land deals, power agreements and contracts as they happen, checked against their sources.Ultra
  • Project Watch and the weekly roundup. Watch up to 25 projects and get a Monday email on the ones that moved since the weekly research run.Ultra
  • Same-day watch alerts. Get an email the day a watched project gets a new site video, FAA crane filing, EPA permit or satellite reading.Ultra
  • Spezia Data Center Weekly. A free email every Tuesday on what moved in the U.S. build-out, for readers who sell into, build or finance it.Free
  • Monthly build-out report. A dated monthly report on the state of the U.S. data center build-out, written from the tracker's own data.Free

Who uses it

Questions about Data center laws and local rules

Where do the measures come from?

The Federal Register and the U.S. government's own bill status files, read directly; state bills on data centers from the legislature records kept by LegiScan (bill data CC BY 4.0) and Open States; and a weekly search of legislatures, county and city agendas and codes, utility commissions and the press. A measure is kept only when a quote from its document says what it does, and its status and dates only when a quote or an official record states them.

Is every measure linked to its official text?

Each week Spezia looks for the official page of every live measure: the legislature, the county or city code, the commission docket or the Federal Register. When none is found yet, the page says so and links the report it came from.

Is this legal advice?

No. It is a sourced record of what each measure says and where it stands. Read the official text, and ask counsel before acting on it.

Which plan includes it?

Ultra, with the rest of the build-out. A free account opens the whole build-out 3 days a month.

Often used with

  • 800+ U.S. data center projects: who is involved and which trades are buying now.

    See it live
  • Every tracked project on the map, by stage and size.

    See it live
  • Planned plants, the grid connection queues and the power gap in each state.

    See it live

Know every law, moratorium, tax break and power tariff that decides where data centers get built.

Part of Ultra. A free account opens the whole build-out 3 days a month, so you can see it before you pay.

Open laws and local rules