Skip to content

xAI Colossus (South Memphis)

Data center project in Memphis, Tennessee

xAI Colossus (South Memphis) is a data center project in Memphis, Tennessee, operating, developed by xAI Corp., with a stated size of 422 MW. Last reported June 16, 2026, from 1 source.

Status
Operational
Developer
xAI Corp.
Location
Memphis, Tennessee
Stated size
422 MW
Last reported
June 16, 2026
Sources
1 source
Other companies on the job
3 companies named, on Ultra
Public records

Is it moving?

No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.

What the sources say

Reports behind this page

  1. Report from datacentersexposed.com · datacentersexposed.com, June 16, 2026
Who is on this job

What the full file adds

  • General contractorOpen: not named yet
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply2 named
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners3 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom1 deal on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

Other data centers in Memphis and Tennessee

Every data center project in Tennessee →
Free sample

Get every active project in Tennessee.

Tell us what you sell. You get the approved and under-construction projects in Tennessee and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.