Skip to content

Colossus

Data center project in Memphis, Tennessee

Colossus is a data center project in Memphis, Tennessee, under construction, developed by xAI, with a stated size of 2 GW. Last reported November 7, 2026, from 10 sources.

Status
Under construction
Developer
xAI
Location
Memphis, Tennessee
Stated size
2 GW
Last reported
·
Sources
10 sources
Other companies on the job
19 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • ZoningZoning · Substitute Ordinance No. 5988 · ailawsusa.com ↗
  • One-year data center rezoning/site plan/building permit pauseZoning · Under review · globaldatacenters.net ↗
  • ZoningZoning · Under review · tri-statedefender.com ↗
  • Air permitAir permit · Mississippi Environmental Quality Permit Board · aigridwatch.com ↗
  • Environmental reviewEnvironmental review · U.S. District Court for the Northern District of Mississippi · aigridwatch.com ↗
  • NAACP preliminary injunction request on Southaven gas turbinesEnvironmental review · U.S. District Court for the Northern District of Mississippi · aigridwatch.com ↗
  • MDEQ agreed order on retirement of 69 temporary turbinesEnvironmental review · Mississippi Department of Environmental Quality · aigridwatch.com ↗

What the sources say

  • Reported

    “xAI is expanding its Colossus complex to nearly 2 GW of power capacity and 1 million GPUs by adding a third facility in Southaven.”

    airtrain.ai ↗ ·

  • Status

    “xAI has purchased a third facility in Southaven, Mississippi, to push its total computing capacity to nearly 2 gigawatts.”

    airtrain.ai ↗ ·

  • Size

    “xAI is expanding its Colossus complex to nearly 2 GW of power capacity and 1 million GPUs”

    airtrain.ai ↗ ·

  • Reported

    “xAI built the first phase of its Colossus supercomputer in 122 days”

    digital.enr.com ↗ ·

  • Size

    “including one near Southaven, Miss., with 2 GW of planned power”

    digital.enr.com ↗ ·

  • Status

    “Colossus went into a former Electrolux factory in 123 days”

    thecoolingreport.com ↗ ·

  • Reported

    “the Colossus facility near Boxtown”

    kfvs12.com ↗ ·

  • Capacity

    2,000 MW

    aigridwatch.com ↗ ·

  • Colossus 1 power

    340 MW

    globaldatacenters.net ↗ ·

  • Colossus 2 power

    946 MW

    globaldatacenters.net ↗ ·

  • Planned power plant

    1.2 gigawatt

    tri-statedefender.com ↗ ·

  • New building (Colossus 2 adjacent)

    $659.3 million, 75-foot, four-story, ~312,000 sq ft

    aigridwatch.com ↗ ·

  • Launch

    2023

    tri-statedefender.com ↗ ·

  • Employees

    3,000 employees

    tri-statedefender.com ↗ ·

  • Truck traffic

    lower vehicular traffic patterns

    ninerswire.usatoday.com ↗ ·

Reports behind this page

  1. xAI Colossus Expansion: 2 GW Capacity and 1 Million GPUs - airtrain.ai · airtrain.ai ·
  2. ENR Sections • Spotlight on Data Centers – Construction & Technology • The Speed of Data · digital.enr.com ·
  3. The Mechanical Contractor That Turned a Factory Into Colossus in 123 Days Has Filed $137 Million in Liens. It Owes Its Own Subcontractors $200 Million. · thecoolingreport.com ·
  4. Contractor who built Colossus and Colossus II says Elon Musk owes him colossal amount of money · kfvs12.com ·
Who is on this job

What the full file adds

  • General contractor1 named
  • Electrical contractor1 named
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply4 named
  • Tenant2 named
  • Investors and lenders2 named
  • Named builders, suppliers and partners19 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom8 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Memphis and Tennessee

Every data center project in Tennessee →
Free sample

Get every active project in Tennessee.

Tell us what you sell. You get the approved and under-construction projects in Tennessee and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.