Stargate Abilene
Data center project in Abilene, Texas
Stargate Abilene is a data center project in Abilene, Texas, under construction, developed by Crusoe, with a stated size of 900 MW. Last reported November 8, 2026, from 118 sources.
- Status
- Under construction
- Developer
- Crusoe
- Location
- Abilene, Texas
- Stated size
- 900 MW
- Stated investment
- $15B
- Last reported
- November 8, 2026
- Sources
- 118 sources
- Other companies on the job
- 63 companies named, on Ultra
Is it moving?
Permits and filings
- IncentiveIncentive · Approved · December 21, 2021aigridwatch.com ↗
- IncentiveIncentive · Approved · February 13, 2025aigridwatch.com ↗
- TCEQ Standard Permit 177263 for on-site gas turbinesAir permit · TCEQ · 177263 · Status not statedsuedatacenters.org ↗
- Campus permit for 62 diesel generators and 10 gas turbinesAir permit · Status not stated · January 1, 2026canonical.cc ↗
- Utility filingUtility filing · Status not statedgrowthifye.com ↗
- Public recordPublic record · Appealed · July 17, 2025aigridwatch.com ↗
What the sources say
Status
“one of the most ambitious AI infrastructure builds currently underway”
Status
“Status Under Construction”
Size
“scaling toward eight buildings, roughly 4 million square feet, and 1.2 gigawatts of compute”
Size
“with a total power capacity of 1.2 gigawatts”
Acreage
1,100 acres
Square footage
approximately 4 million square feet
Campus power capacity
1.2 GW
Operating capacity
618 MW
On-site generation
200-300 MW
Cooling
Closed-loop, direct-to-chip liquid cooling with zero-water evaporation
Construction start
June 2024
Phase 1 go-live
September 30, 2025
Peak workforce
7,000 tradespeople
Permanent jobs
357 permanent jobs at a minimum $57,600 salary
Reports behind this page
- Report from linkedin.com · linkedin.com, August 2, 2026
- Report from exchange.construction · exchange.construction, June 26, 2026
- Report from exchange.construction · exchange.construction, June 17, 2026
What the full file adds
- General contractor3 named
- Electrical contractor2 named
- Mechanical contractor1 named
- Engineering and commissioning5 named
- Power and cooling equipment2 named
- Utility and power supply9 named
- Tenant3 named
- Investors and lenders19 named
- Named builders, suppliers and partners63 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom40 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in Abilene and Texas
- Crusoe Abilene AI CampusUnder constructionSame townAbileneCrusoe2.1 GW
- Abilene AI ParkUnder constructionSame townAbileneCrusoeSize not stated
- second 900MW data centre in AbileneUnder constructionSame townAbileneCrusoeSize not stated
- Crusoe-Microsoft Abilene AI Factory ExpansionApprovedSame townAbileneCrusoe EnergySize not stated
- Vantage DC Abilene - TX3 - Project FrontierAnnouncedSame townAbileneVantage Data Centers1.4 GW
- Lancium Clean Campus AbileneAnnouncedSame townAbileneCrusoe Energy Systems200 MW