Crusoe Abilene AI Campus
Data center project in Abilene, Texas
Crusoe Abilene AI Campus is a data center project in Abilene, Texas, under construction, developed by Crusoe, with a stated size of 2.1 GW. Last reported March 29, 2026, from 4 sources.
- Status
- Under construction
- Developer
- Crusoe
- Location
- Abilene, Texas
- Stated size
- 2.1 GW
- Last reported
- March 29, 2026
- Sources
- 4 sources
- Other companies on the job
- 4 companies named, on Ultra
Is it moving?
Permits and filings
- TCEQ Air Quality Permit 182126, PSDTX1688 and GHGPSDTX263Air permit · Texas Commission on Environmental Quality (TCEQ) · Under review · November 7, 2025texasvwfund.com ↗
- Public recordPublic record · Filedisadatacentercoming.com ↗
- Utility filingUtility filing · ERCOT · Approvedrealclear.ai ↗
What the sources say
Status
“Site preparation has begun, with the first building expected online by mid-2027.”
Size
“bringing the total projected capacity at the Abilene site to 2.1 GW”
Status
“Construction work has started, and the first building is expected to be operational by mid-2027”
Size
“Crusoe has announced that it will build a 900 megawatt AI data centre campus in Abilene in Texas”
Status
“announcing plans for a 900 MW AI data center facility in Abilene”
IT capacity
900 MW
Critical IT load per building
336 MW
Total Abilene site capacity
approximately 2.1 GW
Cooling
closed-loop non-evaporative liquid cooling
First building energization
mid-2027
Construction start
land clearing and site preparation underway
Jobs
thousands of construction and hundreds of permanent jobs
Location
Abilene, Taylor County, TX
Utility
AEP Texas
Reports behind this page
- Report from w.media · w.media, March 29, 2026
- Report from aidatainsider.com · aidatainsider.com, March 29, 2026
- Report from datacenterknowledge.com · datacenterknowledge.com, March 26, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- Tenant3 named
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners4 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Abilene and Texas
- Stargate AbileneUnder constructionSame townAbileneCrusoe900 MW
- Abilene AI ParkUnder constructionSame townAbileneCrusoeSize not stated
- second 900MW data centre in AbileneUnder constructionSame townAbileneCrusoeSize not stated
- Crusoe-Microsoft Abilene AI Factory ExpansionApprovedSame townAbileneCrusoe EnergySize not stated
- Vantage DC Abilene - TX3 - Project FrontierAnnouncedSame townAbileneVantage Data Centers1.4 GW
- Lancium Clean Campus AbileneAnnouncedSame townAbileneCrusoe Energy Systems200 MW
Get every active project in Texas.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.