Researched November 9, 2026
Data centers in Florida
Spezia tracks 11 data center projects in Florida: 1 under construction, 4 approved, 3 announced, 1 blocked or paused, 2 with no stated status. The 1 active project that state a size add up to 600 MW.
- Under construction1
- Approved4
- Announced3
- Blocked or paused1
- Unknown2
- 0 projects with FAA crane filings
- 0 projects with EPA construction stormwater coverage
- 0 projects with an EPA air permit
Most projects: Indiantown (2), Auburndale (1), Fort Meade (1), Holder (1), Loxahatchee (1), Maitland (1), Miami (1), Orlando (1).
Every tracked project in Florida
Being built first, then by stated size. Open a project for its sources, its public records and what is known about who is on the job.
- HostDime SuperNova Data CenterUnder constructionMaitlandHostDimeSize not stated
- Project TangoApprovedLoxahatcheePBA Holdings600 MW
- DCIP Group data center campusApprovedTown not statedDCIP GroupSize not stated
- DCIP Group DeSoto County data center projectApprovedTown not statedDCIP GroupSize not stated
- Fort Meade data centerApprovedFort MeadeDeveloper not namedSize not stated
- Project Silver FoxAnnouncedIndiantownPanattoni Development Co.1 GW
- Auburndale Technology CenterAnnouncedAuburndaleHillwood Development Company350 MW
- Silver Fox 606 data centerAnnouncedIndiantownSilver Fox 606 LLCSize not stated
- Holder data centerBlocked or pausedHolderThe Deltona CorporationSize not stated
- Iron Mountain Data Center Fit-Out ProjectUnknownMiamiDeveloper not namedSize not stated
- Kennedy Data Center (KDC)UnknownOrlandoDeveloper not namedSize not stated
Who is building and supplying the Florida projects
- Named builders and suppliersThe general contractor, trades and equipment suppliers named on each Florida project, and which roles are still open.Ultra
- Buying stage by tradeWhat each trade is likely buying on each job now.Ultra
- ContactsSenior people at the companies on each job, where public pages name them.Ultra
- Who pays whomEquity, loans, leases, power deals and equipment orders, each with its source.Ultra
- AlertsAn email the day a Florida project you watch moves, plus a weekly roundup.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Get the active Florida projects in your inbox.
Tell us what you sell. You get the approved and under-construction projects in Florida and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.
Get the projects that moved, every Tuesday
Free. New projects, stage changes, contract awards, power deals and local opposition across the U.S., each with its source, plus the projects that moved on Spezia's tracker. One click to unsubscribe.
Questions about data centers in Florida
How many data center projects are in Florida?
Spezia tracks 11 data center projects in Florida: 1 under construction, 4 approved, 3 announced, 1 blocked or paused, 2 with no stated status. Projects found in public sources only; a campus counts once.
Where are data centers being built in Florida?
The most projects are in Indiantown (2), Auburndale (1), Fort Meade (1), Holder (1).
What is the largest data center project in Florida?
By the size its sources state, Project Silver Fox in Indiantown, at 1 GW, announced.
How many data centers are under construction in Florida?
1 project is under construction and 4 more are approved.
Data centers in other states
- Texas 187
- Ohio 60
- Virginia 47
- Arkansas 40
- Mississippi 38
- Georgia 35
- Wyoming 35
- Nevada 30
- California 28
- Indiana 28
- Louisiana 28
- Oklahoma 26
- Pennsylvania 25
- Alabama 24
- Arizona 24
- Kentucky 24
- Colorado 23
- North Dakota 22
- West Virginia 22
- Missouri 21
- Tennessee 21
- Minnesota 19
- Oregon 19
- Illinois 17
- Michigan 17
- Idaho 16
- Utah 16
- New York 15
- South Carolina 15
- Wisconsin 15
- Iowa 14
- New Jersey 14
- North Carolina 14
- New Mexico 13
- Kansas 8
- South Dakota 8
- Washington 7
- Maryland 6
- Montana 6
- Nebraska 5
- Massachusetts 3
- Connecticut 1