Skip to content

Researched November 9, 2026

Data centers in Wisconsin

Spezia tracks 15 data center projects in Wisconsin: 10 under construction, 1 approved, 3 announced, 1 blocked or paused. The 4 active projects that state a size add up to 3.02 GW.

By status
  • Under construction10
  • Approved1
  • Announced3
  • Blocked or paused1
Public records in Wisconsin
  • 1 project with FAA crane filings
  • 0 projects with EPA construction stormwater coverage
  • 1 project with an EPA air permit

Most projects: Beaver Dam (2), DeForest (1), Mount Pleasant (1), Port Washington (1), Racine (1), Wisconsin Rapids (1).

Inside Spezia

Who is building and supplying the Wisconsin projects

  • Named builders and suppliersThe general contractor, trades and equipment suppliers named on each Wisconsin project, and which roles are still open.Ultra
  • Buying stage by tradeWhat each trade is likely buying on each job now.Ultra
  • ContactsSenior people at the companies on each job, where public pages name them.Ultra
  • Who pays whomEquity, loans, leases, power deals and equipment orders, each with its source.Ultra
  • AlertsAn email the day a Wisconsin project you watch moves, plus a weekly roundup.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

Free sample

Get the active Wisconsin projects in your inbox.

Tell us what you sell. You get the approved and under-construction projects in Wisconsin and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.

Get the Wisconsin project list by email

Free. The active data center projects in Wisconsin, with stage, stated size and town, as a spreadsheet. Pick another state if you work elsewhere. Plus the week's moves every Tuesday, if you want them.

Free. One email with the list; Data Center Weekly only if you press yes in it. See the privacy policy.

Questions about data centers in Wisconsin

How many data center projects are in Wisconsin?

Spezia tracks 15 data center projects in Wisconsin: 10 under construction, 1 approved, 3 announced, 1 blocked or paused. Projects found in public sources only; a campus counts once.

Where are data centers being built in Wisconsin?

The most projects are in Beaver Dam (2), DeForest (1), Mount Pleasant (1), Port Washington (1).

What is the largest data center project in Wisconsin?

By the size its sources state, Midwest site (Wisconsin), at 1 GW, under construction.

How many data centers are under construction in Wisconsin?

10 projects are under construction and 1 more is approved. 1 project here has an FAA crane filing or an EPA permit on record.