Skip to content

Meta Beaver Dam data center

Data center project in Beaver Dam, Wisconsin

Meta Beaver Dam data center is a data center project in Beaver Dam, Wisconsin, under construction, developed by Meta, with a stated size of 220 MW. Last reported October 21, 2026, from 23 sources.

Status
Under construction
Developer
Meta
Location
Beaver Dam, Wisconsin
Stated size
220 MW
Stated investment
$1B
Last reported
·
Sources
23 sources
Other companies on the job
8 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • Utility filingUtility filing · datacentercensus.com ↗
  • Tax incremental financing (TID) district for data center infrastructureIncentive · Beaver Dam city council · aigridwatch.com ↗
  • IncentiveIncentive · compute-atlas.com ↗
  • Midwest Environmental Advocates lawsuit over PSC public-records denialPublic record · aigridwatch.com ↗

What the sources say

Reports behind this page

  1. Meta Beaver Dam Data Center Campus · compute-atlas.com ·
  2. Meta Beaver Dam Data Center Campus, Beaver Dam, WI · suedatacenters.org ·
  3. data center · dailyreporter.com ·
Who is on this job

What the full file adds

  • General contractor2 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply2 named
  • Tenant2 named
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners8 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom17 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Beaver Dam and Wisconsin

Every data center project in Wisconsin →
Free sample

Get every active project in Wisconsin.

Tell us what you sell. You get the approved and under-construction projects in Wisconsin and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.