Skip to content

Researched November 9, 2026

Data centers in Colorado

Spezia tracks 23 data center projects in Colorado: 6 under construction, 8 approved, 2 announced, 3 operating, 4 with no stated status. The 8 active projects that state a size add up to 1.34 GW.

By status
  • Under construction6
  • Approved8
  • Announced2
  • Operational3
  • Unknown4
Public records in Colorado
  • 2 projects with FAA crane filings
  • 0 projects with EPA construction stormwater coverage
  • 2 projects with an EPA air permit

Most projects: Windsor (6), Denver (4), Aurora (2), Colorado Springs (2), Parker (2), Boulder (1), Englewood (1), Grand Junction (1).

Every tracked project in Colorado

Being built first, then by stated size. Open a project for its sources, its public records and what is known about who is on the job.

Inside Spezia

Who is building and supplying the Colorado projects

  • Named builders and suppliersThe general contractor, trades and equipment suppliers named on each Colorado project, and which roles are still open.Ultra
  • Buying stage by tradeWhat each trade is likely buying on each job now.Ultra
  • ContactsSenior people at the companies on each job, where public pages name them.Ultra
  • Who pays whomEquity, loans, leases, power deals and equipment orders, each with its source.Ultra
  • AlertsAn email the day a Colorado project you watch moves, plus a weekly roundup.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

Free sample

Get the active Colorado projects in your inbox.

Tell us what you sell. You get the approved and under-construction projects in Colorado and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.

Get the Colorado project list by email

Free. The active data center projects in Colorado, with stage, stated size and town, as a spreadsheet. Pick another state if you work elsewhere. Plus the week's moves every Tuesday, if you want them.

Free. One email with the list; Data Center Weekly only if you press yes in it. See the privacy policy.

Questions about data centers in Colorado

How many data center projects are in Colorado?

Spezia tracks 23 data center projects in Colorado: 6 under construction, 8 approved, 2 announced, 3 operating, 4 with no stated status. Projects found in public sources only; a campus counts once.

Where are data centers being built in Colorado?

The most projects are in Windsor (6), Denver (4), Aurora (2), Colorado Springs (2).

What is the largest data center project in Colorado?

By the size its sources state, Global AI Data Center in Windsor, at 1 GW, approved.

How many data centers are under construction in Colorado?

6 projects are under construction and 8 more are approved. 3 projects here have an FAA crane filing or an EPA permit on record.