Colorado data center (Denver metropolitan area, unnamed)

Data center project in Denver, Colorado

Colorado data center (Denver metropolitan area, unnamed) is a data center project in Denver, Colorado, under construction, with a stated size of 23 MW. Last reported June 18, 2026, from 3 sources.

Status
Under construction
Developer
Not named in the sources
Location
Denver, Colorado
Stated size
23 MW
Stated investment
$192M
Last reported
·
Sources
3 sources
Other companies on the job
3 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • Ordinance authorizing moratorium on data centers (CB26-0431)Zoning · Denver City Council Community Planning and Housing · denver.legistar.com ↗
  • Denver data center pause (CB26-0431)Zoning · City and County of Denver · CB26-0431 · Approved · innowave-studio.com ↗
  • Jefferson County temporary moratorium on data center facilitiesZoning · Jefferson County Board of County Commissioners · pub-jeffco.escribemeetings.com ↗
  • Xcel Energy large-load tariff proceedingUtility filing · Colorado Public Utilities Commission · 24A-0442E · Under review · davisgraham.com ↗
  • Xcel Energy Verified Petition for VarianceUtility filing · Colorado Public Utilities Commission · 26V-0048E · davisgraham.com ↗
  • Tri-State High-Impact Load TariffUtility filing · FERC · ER25-3316 · Denied · davisgraham.com ↗

What the sources say

  • Size

    “a $192 million, 22.5-megawatt data center”

    linkedin.com ↗ ·

  • Reported

    “structural completion on a $192 million, 22.5‑megawatt data center”

    ccdmag.com ↗ ·

  • Status

    “Construction of the data center is scheduled for completion in summer 2027.”

    ccdmag.com ↗ ·

  • Size

    “a $192 million, 22.5‑megawatt data center”

    ccdmag.com ↗ ·

  • Status

    “One of the largest digital infrastructure projects currently underway in the Denver metropolitan area has topped out.”

    linkedin.com ↗ ·

  • Data hall capacity

    two data halls labeled (50 MW) each, totaling 100 MW

    coloradosprings.legistar.com ↗ ·

  • Generators

    60 generators (30 double-stacked units)

    coloradosprings.legistar.com ↗ ·

  • Chillers

    72 air-cooled chillers

    coloradosprings.legistar.com ↗ ·

  • Total square footage

    increases from 561,010 to 585,699 square feet

    coloradosprings.legistar.com ↗ ·

  • Chiller yard

    110,267 square feet

    coloradosprings.legistar.com ↗ ·

  • Vent stacks

    one 80-foot and two 60-foot stacks

    coloradosprings.legistar.com ↗ ·

  • Denver data center pause period

    May 21, 2026 to May 21, 2027

    innowave-studio.com ↗ ·

  • Jefferson County moratorium term

    expire on sixty (60) days thereafter

    pub-jeffco.escribemeetings.com ↗ ·

  • Jefferson County public hearing

    Tuesday, May 19, 2026, at 9:00 am

    pub-jeffco.escribemeetings.com ↗ ·

  • Jefferson County setback

    at least 1,500 feet from any existing Dwelling

    pub-jeffco.escribemeetings.com ↗ ·

Reports behind this page

  1. Report from linkedin.com · linkedin.com ·
  2. AI-Ready $192 Million Data Center Tops Out as Denver’s Digital Infrastructure Demand Accelerates · ccdmag.com ·
  3. Report from linkedin.com · linkedin.com ·
Who is on this job

What the full file adds

  • General contractor2 named
  • Electrical contractor1 named
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners3 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Denver and Colorado

Every data center project in Colorado →
Free sample

Get every active project in Colorado.

Tell us what you sell. You get the approved and under-construction projects in Colorado and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.