Galaxy Helios Data Center Campus
Data center project in Afton, Texas
Galaxy Helios Data Center Campus is a data center project in Afton, Texas, operating, developed by Galaxy, with a stated size of 1.6 GW. Last reported October 15, 2026, from 3 sources.
- Status
- Operational
- Developer
- Galaxy
- Location
- Afton, Texas
- Stated size
- 1.6 GW
- Stated investment
- $3.5B
- Last reported
- ·
- Sources
- 3 sources
- Other companies on the job
- 5 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Size
“Power capacity 200 MW operating; 1.6 GW planned”
Size
“Capacity - 200 MW”
Investment
“This brought Phase 2’s estimated cost to a total of $3.5 billion.”
Reports behind this page
- Report from suedatacenters.org · suedatacenters.org ·
- Report from compute-atlas.com · compute-atlas.com ·
- Report from ktsm.com · ktsm.com ·
What the full file adds
- General contractor1 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply1 named
- Tenant1 named
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners5 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom3 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Afton and Texas
- Galaxy Helios data center Phase 2ApprovedSame town · AftonGalaxy260 MW
- Galaxy Digital HeliosUnder constructionSame town · AftonGalaxy DigitalSize not stated
- Galaxy's Helios Data CenterOperationalSame town · AftonGalaxySize not stated
- GW RanchApproved · Town not statedPacifico Energy Group7.65 GW
- GW Ranch Energy CenterApproved · Town not statedPacifico GW7.65 GW
- Matrix Data Center CampusUnder construction · Sulphur SpringsMSB Global Services, LLC3 GW
Get every active project in Texas.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.