Advanced Manufacturing and Data Center Infrastructure Facility
Data center project in Houston, Texas
Advanced Manufacturing and Data Center Infrastructure Facility is a data center project in Houston, Texas, under construction. Last reported June 8, 2026, from 12 sources.
- Status
- Under construction
- Developer
- Not named in the sources
- Location
- Houston, Texas
- Stated size
- Not stated
- Last reported
- June 8, 2026
- Sources
- 12 sources
- Other companies on the job
- 2 companies named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“an electrical project for an advanced manufacturing and data center infrastructure facility in Houston, TX”
Status
“is being delivered on a fast-paced schedule with completion targeted by the end of 2026”
Reported
“an advanced manufacturing and data center infrastructure facility in Houston, TX”
Square footage
115,000 square feet
Gross square footage
273,000 gross-square-foot
Completion
end of 2026
Electrical contract value
$48 million
Electrical systems
power density, system redundancy, future expandability
Phasing
overlapping phases of design coordination, procurement, and construction
Reports behind this page
- Report from marketscreener.com · marketscreener.com, June 8, 2026
- Report from au.finance.yahoo.com · au.finance.yahoo.com, June 7, 2026
- Report from uk.advfn.com · uk.advfn.com, June 7, 2026
What the full file adds
- General contractor1 named
- Electrical contractor1 named
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom2 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Houston and Texas
- Advanced manufacturing electrical projectUnder constructionSame townHoustonDeveloper not namedSize not stated
- confidential data center customer in HoustonUnder constructionSame townHoustonDeveloper not namedSize not stated
- CTX Houston campusUnder constructionSame townHoustonServerfarmSize not stated
- CTX1 Data CenterUnder constructionSame townHoustonServerfarmSize not stated
- CTX2Under constructionSame townHoustonServerfarmSize not stated
- Fisk Electric data center manufacturing facilityUnknownSame townHoustonDeveloper not namedSize not stated
Get every active project in Texas.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.