Coravel Dallas-Fort Worth campus

Data center project in Dallas-Fort Worth, Texas

Coravel Dallas-Fort Worth campus is a data center project in Dallas-Fort Worth, Texas, under construction, developed by Coravel, with a stated size of 140 MW. Last reported July 17, 2026, from 17 sources.

Status
Under construction
Developer
Coravel
Location
Dallas-Fort Worth, Texas
Stated size
140 MW
Last reported
·
Sources
17 sources
Other companies on the job
6 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

What the sources say

  • Reported

    “three new data center facilities at Coravel's Dallas-Fort Worth campus”

    w.media ↗ ·

  • Size

    “approximately 140 MW of critical IT capacity across three new data center facilities”

    w.media ↗ ·

  • Status

    “with 150MW currently under construction”

    datacenterdynamics.com ↗ ·

  • Reported

    “three purpose-built facilities at Coravel's Dallas-Fort Worth campus”

    secure.businesswire.com ↗ ·

  • Size

    “The long-term agreement covers ~140 megawatts of critical IT load across three purpose-built facilities”

    secure.businesswire.com ↗ ·

  • Address

    10059-10197 Hicks Field Rd, Fort Worth, Texas 76179, USA

    dcpulse.com ↗ ·

  • Acreage

    107 acres

    datacentermap.com ↗ ·

  • Substation

    adjacent Oncor Electric substation

    datacentermap.com ↗ ·

  • Initial IT load

    circa 140 MW

    edge.sitecorecloud.io ↗ ·

  • Expansion IT load

    circa 100 MW

    edge.sitecorecloud.io ↗ ·

  • Total IT capacity

    approximately 240 MW

    dcpulse.com ↗ ·

  • Cooling

    water loop system

    datacentermap.com ↗ ·

  • Phases

    Phase I by 2031, Phase II by 2034

    datacentermap.com ↗ ·

  • Service dates

    staggered through 2028

    edge.sitecorecloud.io ↗ ·

  • Permanent jobs

    37 jobs at $150,000 starting salary

    datacentermap.com ↗ ·

Reports behind this page

  1. Report from w.media · w.media ·
  2. Report from datacenterdynamics.com · datacenterdynamics.com ·
  3. Coravel’s first lease carries a 140MW test - DataCentral · data-central.co.uk ·
  4. Report from secure.businesswire.com · secure.businesswire.com ·
Who is on this job

What the full file adds

  • General contractor1 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • Tenant1 named
  • Investors and lenders4 named
  • Named builders, suppliers and partners6 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom2 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Texas

Every data center project in Texas →
Free sample

Get every active project in Texas.

Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.