Meta Data Center Campus (El Paso, Texas)
Data center project in El Paso, Texas
Meta Data Center Campus (El Paso, Texas) is a data center project in El Paso, Texas, announced, developed by Meta Platforms, Inc., with a stated size of 1 GW. Last reported July 28, 2026, from 1 source.
- Status
- Announced
- Developer
- Meta Platforms, Inc.
- Location
- El Paso, Texas
- Stated size
- 1 GW
- Stated investment
- $14B
- Last reported
- July 28, 2026
- Sources
- 1 source
- Other companies on the job
- 4 companies named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“a data center campus with 1 gigawatt of compute capacity in El Paso, Texas”
Investment
“approximately $14 billion in total development costs for the buildings and long-lived power, cooling and connectivity infrastructure at the campus”
Reports behind this page
- Report from ccbjournal.com · ccbjournal.com, July 28, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioning1 named
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lenders3 named
- Named builders, suppliers and partners4 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom1 deal on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in El Paso and Texas
- El Paso AI data center campusUnder constructionSame townEl PasoMeta1 GW
- El Paso data center campusUnder constructionSame townEl PasoMeta1 GW
- Meta data center campus in El Paso, TexasUnder constructionSame townEl PasoMeta1 GW
- Meta data center in northeast El PasoUnder constructionSame townEl PasoMeta1 GW
- Meta El Paso AI Data Center CampusUnder constructionSame townEl PasoMeta1 GW
- Northeast El Paso data centerUnder constructionSame townEl PasoMeta1 GW
Get every active project in Texas.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.