CyrusOne Bosque County Campus (Thad Hill Energy Center)
Data center project in Texas
CyrusOne Bosque County Campus (Thad Hill Energy Center) is a data center project in Texas, under construction, developed by CyrusOne, with a stated size of 400 MW. Last reported September 23, 2026, from 4 sources.
- Status
- Under construction
- Developer
- CyrusOne
- Location
- Texas
- Stated size
- 400 MW
- Stated investment
- $4B
- Last reported
- ·
- Sources
- 4 sources
- Other companies on the job
- 4 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
Permits and filings
- IncentiveIncentive · Bosque County Commissioners Court · register.calyxos.ai ↗
- TDLR TABS project registrations, CyrusOne Bosque County campus (DFW10, DFW11, DFW17, DFW17B, DFW17C)Building permit · Texas Department of Licensing and Regulation · Filed · register.calyxos.ai ↗
- Groundwater well permit, Middle Trinity Groundwater Conservation DistrictWater · Middle Trinity Groundwater Conservation District · Status not stated · register.calyxos.ai ↗
- Temporary Brazos River water use for constructionWater · Status not stated · register.calyxos.ai ↗
What the sources say
Reported
“CyrusOne Bosque County Campus (Thad Hill Energy Center) is a data center under construction in Texas (Bosque County), operated by CyrusOne.”
Size
“The public record puts it at 400 MW planned.”
Investment
“an expected total investment 'approaching $4 billion'”
Reported
“CyrusOne Bosque County Campus (Thad Hill Energy Center)”
Size
“Capacity 400 MW planned”
Status
“2026-08-26 · source-reported under construction”
Size
“Reported planned 400 MW”
Power capacity
400 MW planned
On-site generation
400 MW
Power source
On site gas
Square footage
more than 700,000 square feet
Initial IT capacity
144 megawatts
Phase 1 capacity
190 MW
Completion
Q4 2026
Construction start
2026-08-26
Location
Bosque County, TX
Investment
approaching $4 billion
Reports behind this page
- CyrusOne Bosque County Campus (Thad Hill Energy Center · suedatacenters.org ·
- CyrusOne Bosque County Campus (Thad Hill Energy Center) · compute-atlas.com ·
- CyrusOne Bosque County Campus (Thad Hill Energy Center) — licensed source row | DataCenterData · datacenterdata.com ·
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply2 named
- TenantOpen: not named yet
- Investors and lenders2 named
- Named builders, suppliers and partners4 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom3 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Texas
- GW RanchApproved · Town not statedPacifico Energy Group7.65 GW
- GW Ranch Energy CenterApproved · Town not statedPacifico GW7.65 GW
- Matrix Data Center CampusUnder construction · Sulphur SpringsMSB Global Services, LLC3 GW
- MSB Matrix Data Center CampusUnder construction · Sulphur SpringsMSB Global Services3 GW
- Crusoe Energy West Texas Data Center ProjectsUnder construction · Town not statedCrusoe Energy2.5 GW
- Crusoe Abilene AI CampusUnder construction · AbileneCrusoe2.1 GW
Get every active project in Texas.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.