CyrusOne Bosque County Campus (Thad Hill Energy Center)

Data center project in Texas

CyrusOne Bosque County Campus (Thad Hill Energy Center) is a data center project in Texas, under construction, developed by CyrusOne, with a stated size of 400 MW. Last reported September 23, 2026, from 4 sources.

Status
Under construction
Developer
CyrusOne
Location
Texas
Stated size
400 MW
Stated investment
$4B
Last reported
·
Sources
4 sources
Other companies on the job
4 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • IncentiveIncentive · Bosque County Commissioners Court · register.calyxos.ai ↗
  • TDLR TABS project registrations, CyrusOne Bosque County campus (DFW10, DFW11, DFW17, DFW17B, DFW17C)Building permit · Texas Department of Licensing and Regulation · Filed · register.calyxos.ai ↗
  • Groundwater well permit, Middle Trinity Groundwater Conservation DistrictWater · Middle Trinity Groundwater Conservation District · Status not stated · register.calyxos.ai ↗
  • Temporary Brazos River water use for constructionWater · Status not stated · register.calyxos.ai ↗

What the sources say

  • Reported

    “CyrusOne Bosque County Campus (Thad Hill Energy Center) is a data center under construction in Texas (Bosque County), operated by CyrusOne.”

    suedatacenters.org ↗ ·

  • Size

    “The public record puts it at 400 MW planned.”

    suedatacenters.org ↗ ·

  • Investment

    “an expected total investment 'approaching $4 billion'”

    suedatacenters.org ↗ ·

  • Reported

    “CyrusOne Bosque County Campus (Thad Hill Energy Center)”

    compute-atlas.com ↗ ·

  • Size

    “Capacity 400 MW planned”

    compute-atlas.com ↗ ·

  • Status

    “2026-08-26 · source-reported under construction”

    datacenterdata.com ↗ ·

  • Size

    “Reported planned 400 MW”

    datacenterdata.com ↗ ·

  • Power capacity

    400 MW planned

    suedatacenters.org ↗ ·

  • On-site generation

    400 MW

    suedatacenters.org ↗ ·

  • Power source

    On site gas

    suedatacenters.org ↗ ·

  • Square footage

    more than 700,000 square feet

    bankstreet.com ↗ ·

  • Initial IT capacity

    144 megawatts

    bankstreet.com ↗ ·

  • Phase 1 capacity

    190 MW

    bankstreet.com ↗ ·

  • Completion

    Q4 2026

    bankstreet.com ↗ ·

  • Construction start

    2026-08-26

    kapwork.com ↗ ·

  • Location

    Bosque County, TX

    suedatacenters.org ↗ ·

  • Investment

    approaching $4 billion

    bankstreet.com ↗ ·

Reports behind this page

  1. CyrusOne Bosque County Campus (Thad Hill Energy Center · suedatacenters.org ·
  2. CyrusOne Bosque County Campus (Thad Hill Energy Center) · compute-atlas.com ·
  3. CyrusOne Bosque County Campus (Thad Hill Energy Center) — licensed source row | DataCenterData · datacenterdata.com ·
Who is on this job

What the full file adds

  • General contractorOpen: not named yet
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply2 named
  • TenantOpen: not named yet
  • Investors and lenders2 named
  • Named builders, suppliers and partners4 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom3 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Texas

Every data center project in Texas →
Free sample

Get every active project in Texas.

Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.