Abernathy Joint Venture
Data center project in Abernathy, Texas
Abernathy Joint Venture is a data center project in Abernathy, Texas, announced, developed by Fluidstack, with a stated size of 168 MW. Last reported July 10, 2026, from 6 sources.
- Status
- Announced
- Developer
- Fluidstack
- Location
- Abernathy, Texas
- Stated size
- 168 MW
- Last reported
- ·
- Sources
- 6 sources
- Other companies on the job
- 2 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“the Abernathy Joint Venture with Fluidstack”
Status
“The joint venture was established in October 2025 to develop a 168MW data center campus”
Reported
“the "Abernathy Joint Venture" (JV) with Fluidstack”
Reported
“The Abernathy project in Texas was established in 2025 to develop a 168MW AI data centre campus.”
Reported
“The Abernathy JV was established in 2025 to develop a 168 MW AI data center campus in Abernathy, Texas.”
Reported
“The Abernathy Joint Venture was established in 2025 to develop a 168 MW AI data center campus in Abernathy, Texas.”
Status
“Upon completion of the sale, Fluidstack will lead the project’s further development.”
Size
“a 168 MW AI data center campus in Abernathy, Texas”
Reports behind this page
- Report from datamagz.com · datamagz.com ·
- Report from datacenterdynamics.com · datacenterdynamics.com ·
- Report from datacentremagazine.com · datacentremagazine.com ·
- Anthropic to Occupy 401 MW Kentucky Data Center Campus · commercialsearch.com ·
- Report from techzine.eu · techzine.eu ·
- Report from datacenterdynamics.com · datacenterdynamics.com ·
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lenders1 named
- Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom3 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Abernathy and Texas
- Project CaprockUnder constructionSame town · AbernathyAligned Data Centers540 MW
- HRL1 & Fluidstack-2 Data CenterUnknownSame town · AbernathyFluidStackSize not stated
- GW RanchApproved · Town not statedPacifico Energy Group7.65 GW
- GW Ranch Energy CenterApproved · Town not statedPacifico GW7.65 GW
- Matrix Data Center CampusUnder construction · Sulphur SpringsMSB Global Services, LLC3 GW
- MSB Matrix Data Center CampusUnder construction · Sulphur SpringsMSB Global Services3 GW