Stargate Milam County
Data center project in Milam County, Texas
Stargate Milam County is a data center project in Milam County, Texas, under construction, developed by SB Energy, with a stated size of 1.2 GW. Last reported October 30, 2026, from 6 sources.
- Status
- Under construction
- Developer
- SB Energy
- Location
- Milam County, Texas
- Stated size
- 1.2 GW
- Stated investment
- $470M
- Last reported
- October 30, 2026
- Sources
- 6 sources
- Other companies on the job
- 3 companies named, on Ultra
Is it moving?
Permits and filings
- Reinvestment zoneIncentive · Milam County · Approveddatacentercensus.com ↗
- Freebird Data Center Phase 1 state accessibility registrationPublic record · TABS2026017746 · Fileddatacentercensus.com ↗
What the sources say
Reported
“Stargate Milam County Burlington”
Reported
“Stargate Milam County”
Investment
“Stated investment $470 million”
Status
“Under constructionPhase 1 topped out March 2026; state filing lists Oct 15 completion”
Size
“Planned capacity 1.2 GW”
Reported
“Milam County Texas, USA 1.1 GW Under construction with SB Energy”
Status
“Under construction with SB Energy”
Planned capacity
1.2 GW
Acreage
595 acres
Floor area
548,950 sq ft
Buildings
multiple buildings, 1.5 million sq ft
Cooling
Closed-loop water cooling
Power supply
on-site solar generation and storage
Announced
2025-09-23
Completion
October 15, 2026
Construction start
2026-01-04
Address
County Road 133, Burlington, TX 76519
Reports behind this page
- Data Center Fact Sheet: Milam County, Texas · datacentercensus.com, October 30, 2026
- Stargate Milam County · datacentercensus.com, October 19, 2026
- Stargate Milam County Data Center in Burlington, TX: Status · datacentercensus.com, September 22, 2026
- Stargate Project Status Report 2026 | Presenc AI · presenc.ai, May 21, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply1 named
- Tenant1 named
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners3 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom4 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in Milam County and Texas
- Stargate Texas data center (Milam County)Under constructionSame townMilam CountySB Energy1.2 GW
- FreebirdUnder constructionSame townMilam CountySB EnergySize not stated
- Milam County data centre projectAnnouncedSame townMilam CountyOpenAI1.2 GW
- Milam County data centre siteAnnouncedSame townMilam CountySB EnergySize not stated
- GW RanchApprovedTown not statedPacifico Energy Group7.65 GW
- GW Ranch Energy CenterApprovedTown not statedPacifico GW7.65 GW
Get every active project in Texas.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.