Skip to content

DFW12

Data center project in Red Oak, Texas

DFW12 is a data center project in Red Oak, Texas, approved, developed by DataBank. Last reported June 19, 2025, from 1 source.

Status
Approved
Developer
DataBank
Location
Red Oak, Texas
Stated size
Not stated
Stated investment
$325M
Last reported
·
Sources
1 source
Other companies on the job
1 company named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.

What the sources say

  • Reported

    “The US colo firm has filed two applications with the Texas Department of Licensing and Regulation, for DFW11 and DFW12, at its campus in Red Oak.”

    datacenterdynamics.com ↗ ·

  • Investment

    “The company aims to invest $325 million in each facility.”

    datacenterdynamics.com ↗ ·

Reports behind this page

  1. DataBank files to develop two more data centers at upcoming Red Oak, Texas, campus · datacenterdynamics.com ·
Who is on this job

What the full file adds

  • General contractorOpen: not named yet
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioning1 named
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Who buys the gear, Cooling view, Site and shell timing, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Trades named on each job, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Making the case to the town, Laws and local rules.
  • Power and the grid. Waiting on the grid, On-site power plants, Space data centers, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel, CSV and CRM downloads, Team territories, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts, Territory alerts.
Everything Ultra includes, feature by feature →

Other data centers in Red Oak and Texas

Every data center project in Texas →
Free sample

Get every active project in Texas.

Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.