DC Blox Douglas County data center campus
Data center project in Georgia
DC Blox Douglas County data center campus is a data center project in Georgia, announced, developed by DC Blox, with a stated size of 120 MW. Last reported September 27, 2026, from 1 source.
- Status
- Announced
- Developer
- DC Blox
- Location
- Georgia
- Stated size
- 120 MW
- Last reported
- September 27, 2026
- Sources
- 1 source
- Other companies on the job
- 10 companies named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“DC Blox has obtained $1.15 billion in construction financing for a new data center campus coming to Douglas County”
Status
“DC Blox expects the campus, which will be utilized by cloud and AI users, to be available as early as 2027.”
Size
“The funds will support the development of a 120-megawatt (MW) data center and include campus expansion to support an additional 80 MW of space.”
Reports behind this page
- Industrial Archives · rebusinessonline.com, September 27, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lenders10 named
- Named builders, suppliers and partners10 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom3 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Georgia
- OpenAI Effingham County data center campusApprovedRinconOpenAI3.2 GW
- Project Camellia (OpenAI Data Center)ApprovedRinconOpenAI3.2 GW
- Project SailApprovedNewnanPrologis900 MW
- DC BLOX datacenter in Douglasville, GAUnder constructionDouglasvilleDC BLOX180 MW
- ATL5 and ATL6Under constructionAtlantaDataBank120 MW
- DC BLOX Atlanta West (ATL1)Under constructionLithia SpringsDC BLOX120 MW
Get every active project in Georgia.
Tell us what you sell. You get the approved and under-construction projects in Georgia and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.