DC BLOX datacenter in Douglasville, GA
Data center project in Douglasville, Georgia
DC BLOX datacenter in Douglasville, GA is a data center project in Douglasville, Georgia, under construction, developed by DC BLOX, with a stated size of 180 MW. Last reported September 10, 2026, from 2 sources.
- Status
- Under construction
- Developer
- DC BLOX
- Location
- Douglasville, Georgia
- Stated size
- 180 MW
- Last reported
- ·
- Sources
- 2 sources
- Other companies on the job
- 1 company named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
Permits and filings
- Rezoning from PUD (base R-6/PRD) to Light Industrial for data centerZoning · City of Douglasville Planning Commission · Denied · douglasville.civicweb.net ↗
- Rezoning from PUD (base R-6/PRD) to Light Industrial for data centerZoning · City of Douglasville Planning Commission · douglasville.civicweb.net ↗
- Height variance to allow 3-story building at 75 feetZoning · City of Douglasville · Filed · douglasville.civicweb.net ↗
- Parking variance requesting 262 spaces instead of 1,657Zoning · City of Douglasville · Filed · douglasville.civicweb.net ↗
- Text amendment to modify parking calculations for data centersZoning · City of Douglasville · Under review · douglasvillega.gov ↗
- Development of Regional Impact reviewEnvironmental review · Atlanta Regional Commission · Status not stated · documents.atlantaregional.com ↗
- Stream buffer variances for data center developmentEnvironmental review · City of Douglasville · Withdrawn · douglasville.civicweb.net ↗
- Height variance for water towers to 50 feetZoning · City of Douglasville · douglasville.civicweb.net ↗
What the sources say
Reported
“DC BLOX is building ATL-West, a 180-megawatt data center campus on 55 acres in Douglasville, Georgia”
Status
“Status Under Construction”
Reported
“our trusted client, DC BLOX, on their datacenter in Douglasville, GA”
Status
“This ToppingOut ceremony marked a moment to honor the amazing teams and trade partners”
Acreage
approximately 95.052 acres
Buildings
Building A 402,000 sq ft; Building B 595,000 sq ft; Building C 660,000 sq ft
Building height
3 story building at 75 feet
Building footprint share of site
~13%
Address
1701 North River Road, Douglasville
Acreage (DRI)
56 acres
Square footage (DRI)
761,852 SF combined
Substation
substation on site per site plan
Water use
0.018 MGD water supply demand and 0.018 MGD sewage flow
Truck traffic
754 new daily vehicular trips
Reports behind this page
- DC BLOX ATL-West Data Center Campus, Douglasville GA · exchange.construction ·
- Report from linkedin.com · linkedin.com ·
What the full file adds
- General contractor1 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Georgia
- OpenAI Effingham County data center campusApproved · RinconOpenAI3.2 GW
- Project Camellia (OpenAI Data Center)Approved · RinconOpenAI3.2 GW
- Project SailApproved · NewnanPrologis900 MW
- ATL5 and ATL6Under construction · AtlantaDataBank120 MW
- DC BLOX Atlanta West (ATL1)Under construction · Lithia SpringsDC BLOX120 MW
- 45MW data center in AtlantaUnder construction · AtlantaDeveloper not namedSize not stated
Get every active project in Georgia.
Tell us what you sell. You get the approved and under-construction projects in Georgia and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.