Wonder Valley campus

Data center project in Utah

Wonder Valley campus is a data center project in Utah, announced, developed by O’Leary Digital Limited, with a stated size of 7.5 GW. Last reported February 24, 2026, from 6 sources.

Status
Announced
Developer
O’Leary Digital Limited
Location
Utah
Stated size
7.5 GW
Last reported
·
Sources
6 sources
Other companies on the job
8 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • MIDA designation for Wonder Valley project areaZoning · Box Elder County Commission · linkedin.com ↗
  • Resolution 26-11 consenting to MIDA designationZoning · Box Elder County Commission · Resolution 26-11 · baxtel.com ↗
  • Stratos Project Area approvalZoning · Military Installation Development Authority (MIDA) · Approved · baxtel.com ↗
  • Utah DEQ DAQ Notice of Intent air permitAir permit · Utah DEQ Division of Air Quality · Filed · baxtel.com ↗
  • Developer water rights applicationWater · Withdrawn · linkedin.com ↗
  • Referendum effort to stop the developmentPublic record · Filed · muckrack.com ↗
  • Lawsuit challenging MIDA authorityPublic record · Filed · muckrack.com ↗

What the sources say

  • Reported

    “advance development of the Wonder Valley Utah Campus, a planned 7.5-gigawatt powered compute facility in Box Elder County’s Golden Spike District”

    constructionreviewonline.com ↗ ·

  • Status

    “Status: Permitting underway; capitalized toward shovel-ready execution”

    constructionreviewonline.com ↗ ·

  • Size

    “The campus will generate up to 7.5 gigawatts of power through phased deployment of powered buildings”

    constructionreviewonline.com ↗ ·

  • Reported

    “advance development of Wonder Valley Utah, a large-scale powered compute campus located in Utah”

    tools.prnewswire.com ↗ ·

  • Size

    “Each Wonder Valley campus is planned for 7.5 gigawatts of power generation capacity”

    tools.prnewswire.com ↗ ·

  • Acreage

    ~40,000 acres

    muckrack.com ↗ ·

  • Project area acreage

    41,200 acres

    linkedin.com ↗ ·

  • Total capacity

    9 GW

    baxtel.com ↗ ·

  • Phase 1 capacity

    ~3 GW

    baxtel.com ↗ ·

  • On-site generation

    100% off-grid natural gas

    baxtel.com ↗ ·

  • Phases

    Hansel Valley (Phase 1) and Locomotive Springs (Phase 2)

    baxtel.com ↗ ·

  • Construction start

    2029

    baxtel.com ↗ ·

  • First units online

    Q4 2028

    baxtel.com ↗ ·

  • Permanent jobs

    2,000 permanent jobs

    muckrack.com ↗ ·

  • Site access roads

    dirt and gravel roads

    muckrack.com ↗ ·

Reports behind this page

  1. Report from constructionreviewonline.com · constructionreviewonline.com ·
  2. Report from tools.prnewswire.com · tools.prnewswire.com ·
Who is on this job

What the full file adds

  • General contractor1 named
  • Electrical contractor1 named
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioning2 named
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners8 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Utah

Every data center project in Utah →
Free sample

Get every active project in Utah.

Tell us what you sell. You get the approved and under-construction projects in Utah and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.