Delta Gigasite
Data center project in Utah
Delta Gigasite is a data center project in Utah, under construction, developed by Creekstone Energy, with a stated size of 230 MW. Last reported July 23, 2026, from 1 source.
- Status
- Under construction
- Developer
- Creekstone Energy
- Location
- Utah
- Stated size
- 230 MW
- Last reported
- ·
- Sources
- 1 source
- Other companies on the job
- 4 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
Permits and filings
- Rezoning of ~1,200 acres from agricultural to heavy industrialZoning · Millard County Commission · ksl.com ↗
- Heavy Industrial (HI) zoning approvalZoning · Millard County Commission · creekstone.energy ↗
- C-2 Conditional Use PermitZoning · Millard County · C-2 · creekstone.energy ↗
- Solar rezone of public landZoning · Millard County planning and zoning committee · Denied · suunews.net ↗
- Air permits for on-site generationAir permit · Under review · creekstone.energy ↗
- Gas interconnect agreementUtility filing · creekstone.energy ↗
- Phase I Environmental AssessmentEnvironmental review · Approved · creekstone.energy ↗
- UDOT highway access documentationTraffic study · UDOT · Filed · creekstone.energy ↗
What the sources say
Reported
“its planned Delta Gigasite data center campus in Millard County, Utah”
Status
“construction of the interconnection is underway”
Size
“29 natural gas reciprocating engines with combined capacity of approximately 230 MW”
Acreage
1,143 acres
Square footage
20 million square feet
Power capacity
10 GW
Phase 1 capacity
220 MW
Gas interconnect capacity
43,000 Dth/day (230 MW)
Cooling
Dry, essentially waterless
Water use
up to 200 acre-feet per year
Construction start
December 2025
Phase 1 deliveries
end of 2027
Jobs
around 120 jobs, median salary $130,000
Reports behind this page
- Creekstone secures gas capacity for Utah data center power project - News · compressortech2.com ·
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioning1 named
- Power and cooling equipmentOpen: not named yet
- Utility and power supply2 named
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners4 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Utah
- Creekstone Energy Delta GigasiteUnder construction · DeltaCreekstone Energy10 GW
- Antelope Data Campus (Project Antelope)Approved · Cedar CityPronghorn Development LLC1.5 GW
- Joule Energy and Data Center CampusUnder construction · McCornickJoule Capital Partners1 GW
- Project PulsarUnder construction · West JordanNovva Data Centers200 MW
- QTS data center campus in Eagle Mountain, Utah (SLC1)Under construction · Eagle MountainQTS200 MW
- Novva Data Centers Salt Lake City campusUnder construction · West JordanNovva Data Centers175 MW
Get every active project in Utah.
Tell us what you sell. You get the approved and under-construction projects in Utah and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.