Data center project in Cedar Creek, Texas
EDCAUS13 is a data center project in Cedar Creek, Texas, under construction, developed by EdgeConneX. Last reported September 18, 2026, from 4 sources.
- Status
- Under construction
- Developer
- EdgeConneX
- Location
- Cedar Creek, Texas
- Stated size
- Not stated
- Stated investment
- $700M
- Last reported
- ·
- Sources
- 4 sources
- Other companies on the job
- 2 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“Texas Department of Licensing and Regulation filings cover four one-story buildings at 6682 FM 535, EDCAUS11, EDCAUS12, EDCAUS13, and EDCAUS14”
Status
“EDCAUS13 and EDCAUS14 are scheduled to start September 1, 2026”
Investment
“each carrying an estimated construction cost of $700 million”
Reported
“The privately funded facilities — EDCAUS11, EDCAUS12, EDCAUS13 and EDCAUS14 — would be built at 6682 FM 535 in Cedar Creek.”
Status
“Work on EDCAUS13 and EDCAUS14 was scheduled to begin Sept. 1 and conclude by March 31, 2029.”
Investment
“The filings estimate each building will cost $700 million.”
Reported
“The first $700 million filing for the project called "EDCAUS13" is for a one-story 730,000-square-foot data center”
Status
“Both projects are expected to begin construction on September 1 and are estimated to be finished by March 31, 2029, according to each TDLR.”
Reports behind this page
- EdgeConneX Files Plans for Up to 19-Building, Multi-Billion-Dollar Data Center Campus in Bastrop County, Texas · nextdcx.com ·
- Four Cedar Creek data centers represent $2.8 billion development · texreporter.com ·
- 2 massive $700M data centers planned near Austin · mysanantonio.com ·
- Two $700 million data centers are about to take shape near Austin - Two $700 million data centers are about to take shape near Austin · opera.news ·
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioning1 named
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Who buys the gear, Cooling view, Site and shell timing, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Trades named on each job, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Making the case to the town, Laws and local rules.
- Power and the grid. Waiting on the grid, On-site power plants, Space data centers, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel, CSV and CRM downloads, Team territories, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts, Territory alerts.
Other data centers in Cedar Creek and Texas
- EDCAUS14Under constructionSame town · Cedar CreekBURR COMPUTER ENVIRONMENT INCSize not stated
- Cedar Creek gas-fired data center facilityAnnouncedSame town · Cedar CreekBlackChamber Partners490 MW
- GW RanchUnder construction · Town not statedPacifico Energy Group7.65 GW
- Matrix Data Center CampusUnder construction · Sulphur SpringsMSB Global Services, LLC3 GW
- Crusoe Energy West Texas Data Center ProjectsUnder construction · Town not statedCrusoe Energy2.5 GW
- Crusoe Abilene AI CampusUnder construction · AbileneCrusoe2.1 GW
Get every active project in Texas.
Tell us what you sell. You get the approved and under-construction projects in Texas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.