5C MEM01
Data center project in Memphis, Tennessee
5C MEM01 is a data center project in Memphis, Tennessee, developed by 5C Group. Last reported October 5, 2026, from 2 sources.
- Status
- Unknown
- Developer
- 5C Group
- Location
- Memphis, Tennessee
- Stated size
- Not stated
- Stated investment
- $575M
- Last reported
- ·
- Sources
- 2 sources
- Other companies on the job
- 1 company named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Investment
“A data center in Memphis just filed a $575 million permit”
Status
“A data center in Memphis just filed a $575M permit”
Reports behind this page
- A data center in Memphis just filed a $575 million permit — and it's not SpaceXAI · dailymemphian.com ·
- A data center in Memphis just filed a $575M permit — and it's not SpaceXAI · dailymemphian.com ·
What the full file adds
- General contractor1 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Memphis and Tennessee
- ColossusUnder constructionSame town · MemphisxAI2 GW
- 5C Data Centers Memphis AI Factory Campus (MEM01)Under constructionSame town · Memphis5C Data Centers84 MW
- St. Jude Building Z - Phase 3 ExpansionApprovedSame town · MemphisDeveloper not namedSize not stated
- xAI Colossus 2 (Memphis)UnknownSame town · MemphisxAI1 GW
- Colossus 2OperationalSame town · MemphisxAI946 MW
- xAI Colossus (South Memphis)OperationalSame town · MemphisxAI Corp.422 MW
Get every active project in Tennessee.
Tell us what you sell. You get the approved and under-construction projects in Tennessee and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.