Prime Data Centers Elk Grove Village campus
Data center project in Elk Grove Village, Illinois
Prime Data Centers Elk Grove Village campus is a data center project in Elk Grove Village, Illinois, announced, developed by Prime Data Centers, with a stated size of 275 MW. Last reported October 3, 2026, from 2 sources.
- Status
- Announced
- Developer
- Prime Data Centers
- Location
- Elk Grove Village, Illinois
- Stated size
- 275 MW
- Stated investment
- $1B
- Last reported
- ·
- Sources
- 2 sources
- Other companies on the job
- None named yet
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
FAA crane filings
3 filings, 2 with work scheduled now
Latest work from June 29, 2026 to December 31, 2026, up to 350 feet.
- Crane 2026-AGL-8473-OE ↗ · work June 29, 2026 to December 31, 2026 ·
- Mobile crane 2025-AGL-14428-OE ↗ · work November 24, 2025 to November 24, 2026 ·
- Mobile crane 2025-AGL-15099-OE ↗ · work November 3, 2025 to November 2, 2026 ·
3 builders named on the filings, on Ultra.
EPA construction stormwater
1 permit, 1 active
Coverage since August 8, 2023. A site of an acre or more needs this before grading starts.
- EPA record ↗ · Active ·
1 operator named on the permits, on Ultra.
EPA air permits
1 air facility, 1 operating
Equipment on record: diesel engines (generators).
- EPA record ↗ · Operating ·
What the sources say
Reported
“Prime Data Centers has unveiled plans to build a 750,000-square-foot data center campus in the Chicago suburb of Elk Grove Village.”
Status
“Prime Data Centers has unveiled plans to build a 750,000-square-foot data center campus”
Investment
“Prime Data Centers plans to invest up to $1 billion for the project.”
Reported
“Development of Prime Data Center’s campus at 1600 E Higgins Rd in Elk Grove, Illinois.”
Status
“Construction on this building is targeted to be completed in the third quarter of 2023.”
Size
“totaling to 275 MW when fully deployed; referred to as ORD-1.”
Reports behind this page
- Data Centers Archives · rebusinessonline.com ·
- Prime Data Centers - Clune Construction · clunegc.com ·
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partnersEvery company the sources name on this job as they are found, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Elk Grove Village and Illinois
- T5 Data CenterUnknownSame town · Elk Grove VillageT517 MW
- Joliet Technology CenterApproved · JolietPowerHouse Data Centers1.8 GW
- Compass Datacenters Hoffman Estates campusUnder construction · Hoffman EstatesCompass Datacenters500 MW
- CyrusOne data centerApproved · YorkvilleCyrusOne500 MW
- CyrusOne CHI-11 Data Center CampusUnder construction · YorkvilleCyrusOne480 MW
- 2538 S. Wabash AI data centerUnder construction · ChicagoHydraVault20 MW
Get every active project in Illinois.
Tell us what you sell. You get the approved and under-construction projects in Illinois and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.