Monarch Cloud Campus

Data center project in Point Pleasant, West Virginia

Monarch Cloud Campus is a data center project in Point Pleasant, West Virginia, approved, developed by Nscale, with a stated size of 1.35 GW. Last reported November 7, 2026, from 3 sources.

Status
Approved
Developer
Nscale
Location
Point Pleasant, West Virginia
Stated size
1.35 GW
Stated investment
$40B
Last reported
·
Sources
3 sources
Other companies on the job
5 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • Air permitAir permit · R14-0042 · Under review · w4news.org ↗
  • Air construction permit application for 2.16 GW on-site generationAir permit · datacentercensus.com ↗
  • WVDEP unilateral enforcement order for stormwater and mudEnvironmental review · Status not stated · datacentercensus.com ↗
  • State Waters Permit application for Data Center 3Water · WVDEP Division of Water and Waste Management · dep-auth.wv.gov ↗
  • WaterWater · Under review · w4news.org ↗
  • Corps jurisdictional determinations for Phase 1 & 2 and Power Generation North/SouthEnvironmental review · U.S. Army Corps of Engineers · dep-auth.wv.gov ↗
  • State 'high-impact' certificationIncentive · State of West Virginia · datacentercensus.com ↗

What the sources say

  • Status

    “received certification on Aug. 26”

    hoodline.com ↗ ·

  • Size

    “with 1.35 gigawatts planned in its first phase”

    hoodline.com ↗ ·

  • Status

    “Workers broke ground on Phase 1 in July 2026, with that phase expected to run through December 2027.”

    fliphtml5.com ↗ ·

  • Planned capacity

    8 GW

    datacentercensus.com ↗ ·

  • On-site generation

    2.16 GW

    datacentercensus.com ↗ ·

  • Generators

    864 natural-gas engines

    w4news.org ↗ ·

  • Power nodes

    12 power nodes

    w4news.org ↗ ·

  • Limits of disturbance (Data Center 3)

    approximately 166 acres

    dep-auth.wv.gov ↗ ·

  • Study area

    approximately 1,200-acre study area

    dep-auth.wv.gov ↗ ·

  • Stream impacts

    approximately 5,018 linear feet

    dep-auth.wv.gov ↗ ·

  • Wetland impacts

    23.36 acres

    dep-auth.wv.gov ↗ ·

  • Status

    Under construction

    datacentercensus.com ↗ ·

  • Stated investment

    $20 billion

    datacentercensus.com ↗ ·

Reports behind this page

  1. Boone County WV Data Center Certified Without Public Notice · hoodline.com ·
  2. Report from herald-dispatch.com · herald-dispatch.com ·
  3. DIGITAL_082726_EASRCC Newspaper Fall 2026 - Enjoying your free trial · fliphtml5.com ·
Who is on this job

What the full file adds

  • General contractor2 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioning1 named
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners5 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Point Pleasant and West Virginia

Every data center project in West Virginia →
Free sample

Get every active project in West Virginia.

Tell us what you sell. You get the approved and under-construction projects in West Virginia and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.