Digital Filigree
Data center project in Ashburn, Virginia
Digital Filigree is a data center project in Ashburn, Virginia, under construction. Last reported March 22, 2026, from 1 source.
- Status
- Under construction
- Developer
- Not named in the sources
- Location
- Ashburn, Virginia
- Stated size
- Not stated
- Last reported
- ·
- Sources
- 1 source
- Other companies on the job
- 2 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
FAA crane filings
1 filing, 1 with work scheduled now
Latest work from September 18, 2026 to March 18, 2027, up to 250 feet.
- Crane 2026-AEA-11157-OE ↗ · work September 18, 2026 to March 18, 2027 ·
EPA construction stormwater
1 permit, 1 active
A site of an acre or more needs this before grading starts.
- EPA record ↗ · Active ·
1 operator named on the permits, on Ultra.
What the sources say
Reports behind this page
- ENR East 2025 Top Starts · enr.com ·
What the full file adds
- General contractor1 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioning1 named
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Ashburn and Virginia
- DC17 Data CenterUnder constructionSame town · AshburnDeveloper not namedSize not stated
- Dominion Loudoun Tech Center 230 kV Substation ExpansionUnknownSame town · AshburnDeveloper not namedSize not stated
- Gainesville Crossing CampusUnder construction · GainesvilleAffinius Capital and Corscale Data Centers326 MW
- PowerHouse PacificUnder construction · SterlingPowerHouse Data Centres265 MW
- Iron Mountain Data Centers Richmond campusUnder construction · RichmondIron Mountain Data Centers200 MW
- Richmond campus (RCH-1)Under construction · SandstonIron Mountain200 MW
Get every active project in Virginia.
Tell us what you sell. You get the approved and under-construction projects in Virginia and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.