Skip to content

AS02

Data center project in Sterling, Virginia

AS02 is a data center project in Sterling, Virginia, under construction, developed by EdgeCore Digital Infrastructure, with a stated size of 42 MW. Last reported April 21, 2026, from 4 sources.

Status
Under construction
Developer
EdgeCore Digital Infrastructure
Location
Sterling, Virginia
Stated size
42 MW
Last reported
April 21, 2026
Sources
4 sources
Other companies on the job
8 companies named, on Ultra
Public records

Is it moving?

FAA crane filings

8 filings, 2 with work scheduled now

Latest work from February 16, 2026 to December 16, 2026, up to 254 feet.

1 builder named on the filings, on Ultra.

EPA construction stormwater

1 permit, 1 active

A site of an acre or more needs this before grading starts.

1 operator named on the permits, on Ultra.

What the sources say

Reports behind this page

  1. Report from commercialsearch.com · commercialsearch.com, April 21, 2026
  2. Report from datacenterdynamics.com · datacenterdynamics.com, April 20, 2026
Who is on this job

What the full file adds

  • General contractorOpen: not named yet
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply1 named
  • TenantOpen: not named yet
  • Investors and lenders4 named
  • Named builders, suppliers and partners8 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom2 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Sterling and Virginia

Every data center project in Virginia →
Free sample

Get every active project in Virginia.

Tell us what you sell. You get the approved and under-construction projects in Virginia and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.