Novva West Jordan Campus
Data center project in West Jordan, Utah
Novva West Jordan Campus is a data center project in West Jordan, Utah, under construction, developed by Novva Data Centers, with a stated size of 144 MW. Last reported October 27, 2026, from 6 sources.
- Status
- Under construction
- Developer
- Novva Data Centers
- Location
- West Jordan, Utah
- Stated size
- 144 MW
- Stated investment
- $2B
- Last reported
- ·
- Sources
- 6 sources
- Other companies on the job
- 6 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
Permits and filings
- Air permit for 72 natural gas engines and 37 diesel generatorsAir permit · Utah Division of Air Quality · baxtel.com ↗
- Federal request for two-year exemption to run 96 diesel generators without limitsPublic record · Status not stated · baxtel.com ↗
What the sources say
Reported
“Novva West Jordan Campus”
Size
“Novva West Jordan Campus 144 MW”
Status
“Phases 2 (75MW, Dec 2023 start) + 3 (72MW, Jan 2024 start) building to 2026”
Reported
“Novva West Jordan Campus is an operating data center in West Jordan, Utah (Salt Lake County), operated by Novva Data Centers.”
Investment
“a reported $2 billion investment”
Reported
“Novva Data Centers operates its flagship 100 acre Utah campus at 6524 West Old Bingham Highway in West Jordan”
Reported
“Novva Data Centers' West Jordan Data Center Campus in Utah”
Status
“Phases 2 and 3, each approximately 318,000 square feet, broke ground in December 2023 and January 2024.”
Acreage
100 acres
Building 1 square footage
300,000 square feet
Building 2 square footage
318,000 square feet
Building 3 square footage
318,000 square feet
Cooling
waterless air-cooled chillers
Water use
394,667 gallons per month
Phase 2 construction start
December 2023
Phase 3 construction start
January 2024
Reports behind this page
- Report from compute.institute · compute.institute ·
- Novva West Jordan Campus — Project Health Score & Risk Profile | Compute Institute · compute.institute ·
- Novva West Jordan Campus, West Jordan, UT: Status, Power · suedatacenters.org ·
- Novva West Jordan Data Center Campus · datacenterrecord.org ·
- Project Pulsar Topped Out 200MW Natural Gas Facility at Novva’s West Jordan Campus · thejobwalk.com ·
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply1 named
- TenantOpen: not named yet
- Investors and lenders3 named
- Named builders, suppliers and partners6 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom3 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in West Jordan and Utah
- Project PulsarUnder constructionSame town · West JordanNovva Data Centers200 MW
- Novva Data Centers Salt Lake City campusUnder constructionSame town · West JordanNovva Data Centers175 MW
- Utah Data Center Building 3UnknownSame town · West JordanNovva Data CentersSize not stated
- Creekstone Energy Delta GigasiteUnder construction · DeltaCreekstone Energy10 GW
- Antelope Data Campus (Project Antelope)Approved · Cedar CityPronghorn Development LLC1.5 GW
- Joule Energy and Data Center CampusUnder construction · McCornickJoule Capital Partners1 GW
Get every active project in Utah.
Tell us what you sell. You get the approved and under-construction projects in Utah and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.