Skip to content

DC BLOX Nashville data center

Data center project in Nashville, Tennessee

DC BLOX Nashville data center is a data center project in Nashville, Tennessee, blocked or paused, developed by DC BLOX, with a stated size of 50 MW. Last reported August 22, 2026, from 3 sources.

Status
Blocked or paused
Developer
DC BLOX
Location
Nashville, Tennessee
Stated size
50 MW
Last reported
August 22, 2026
Sources
3 sources
Other companies on the job
6 companies named, on Ultra
Public records

Is it moving?

No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.

What the sources say

Reports behind this page

  1. Report from thegridsight.com · thegridsight.com, August 22, 2026
  2. Report from wpln.org · wpln.org, July 15, 2026
  3. Report from particlenews.pages.dev · particlenews.pages.dev, June 7, 2026
Who is on this job

What the full file adds

  • General contractorOpen: not named yet
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply2 named
  • TenantOpen: not named yet
  • Investors and lenders4 named
  • Named builders, suppliers and partners6 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom1 deal on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Nashville and Tennessee

Every data center project in Tennessee →
Free sample

Get every active project in Tennessee.

Tell us what you sell. You get the approved and under-construction projects in Tennessee and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.