Skip to content

New Hyperscale Data Center

Data center project in Stillwater, Oklahoma

New Hyperscale Data Center is a data center project in Stillwater, Oklahoma, under construction, with a stated size of 218 MW. Last reported January 6, 2026, from 1 source.

Status
Under construction
Developer
Not named in the sources
Location
Stillwater, Oklahoma
Stated size
218 MW
Last reported
·
Sources
1 source
Other companies on the job
2 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • Preliminary plat for data center additionSite plan · Stillwater Planning Commission · Approved · okenergytoday.com ↗
  • Final plat for three industrial lotsSite plan · Stillwater Planning Commission · southwestledger.news ↗
  • Building permits for Lots 1 and 2Building permit · Approved · southwestledger.news ↗
  • Planning Commission zoning compliance vote on campusZoning · Stillwater Planning Commission · Approved · datacenterdynamics.com ↗
  • OG&E franchise ordinance for data center electricityUtility filing · City of Stillwater · Status not stated · stillwaterok.gov ↗
  • Tax Incentive District with PILOTsIncentive · City of Stillwater · Under review · datacenterdynamics.com ↗
  • Economic Development AgreementIncentive · City of Stillwater · Status not stated · stillwaterok.gov ↗
  • Richmond Road paving from Perkins Road to Jardot RoadTraffic study · Status not stated · southwestledger.news ↗

What the sources say

  • Reported

    “NEW HYPERSCALE DATA CENTER”

    twc-stl.com ↗ ·

  • Size

    “The approximately 258,000-square-foot, 217.8 MVA facility is designed as a water-cooled data center”

    twc-stl.com ↗ ·

  • Square footage

    258,000 SF

    twc-stl.com ↗ ·

  • Capacity

    217.8 MVA

    twc-stl.com ↗ ·

  • Electrical distribution

    13.8kV to 416V

    twc-stl.com ↗ ·

  • Cooling

    water-cooled, twelve water cooling plants

    twc-stl.com ↗ ·

  • Acreage

    202 acres

    southwestledger.news ↗ ·

  • Campus acreage

    roughly 400 acres

    nathanhammer.substack.com ↗ ·

  • Completion

    Q2 2027

    twc-stl.com ↗ ·

  • Permanent jobs

    approximately 30 jobs per Phase

    stillwaterok.gov ↗ ·

  • Utility

    Oklahoma Gas and Electric

    nathanhammer.substack.com ↗ ·

  • Water use

    50 MGD of daily water rights from Kaw Lake

    stillwaterok.gov ↗ ·

Reports behind this page

  1. Report from twc-stl.com · twc-stl.com ·
Who is on this job

What the full file adds

  • General contractor2 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Stillwater and Oklahoma

Every data center project in Oklahoma →
Free sample

Get every active project in Oklahoma.

Tell us what you sell. You get the approved and under-construction projects in Oklahoma and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.