Skip to content

Project Clydesdale

Data center project in Owasso, Oklahoma

Project Clydesdale is a data center project in Owasso, Oklahoma, under construction, developed by Google. Last reported September 23, 2026, from 3 sources.

Status
Under construction
Developer
Google
Location
Owasso, Oklahoma
Stated size
Not stated
Last reported
·
Sources
3 sources
Other companies on the job
2 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

What the sources say

  • Reported

    “In Owasso, Project Clydesdale is moving forward.”

    kjrh.com ↗ ·

  • Acreage

    506 acres

    fox23.com ↗ ·

  • Location

    between 76th and 86th Streets North and between Sheridan and Yale

    935thepatriot.iheart.com ↗ ·

  • Substation

    new substation installed by PSO

    935thepatriot.iheart.com ↗ ·

  • Ironworkers

    six months of work for 100 to 150 ironworkers

    935thepatriot.iheart.com ↗ ·

  • Electric worker wages

    $40 million in wages for electric workers

    935thepatriot.iheart.com ↗ ·

Reports behind this page

  1. Report from isadatacentercoming.com · isadatacentercoming.com ·
  2. Report from fieldnews.net · fieldnews.net ·
  3. IN DEPTH: Data Center Proposals across Green Country · kjrh.com ·
Who is on this job

What the full file adds

  • General contractor1 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply1 named
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom1 deal on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Oklahoma

Every data center project in Oklahoma →
Free sample

Get every active project in Oklahoma.

Tell us what you sell. You get the approved and under-construction projects in Oklahoma and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.