Skip to content

Vantage NV1 Campus (Storey County)

Data center project in Reno, Nevada

Vantage NV1 Campus (Storey County) is a data center project in Reno, Nevada, under construction, developed by Vantage Data Centers, with a stated size of 224 MW. Last reported October 13, 2026, from 4 sources.

Status
Under construction
Developer
Vantage Data Centers
Location
Reno, Nevada
Stated size
224 MW
Stated investment
$3B
Last reported
·
Sources
4 sources
Other companies on the job
4 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • Class II Air Quality Operating Permit AP7374-4749Air permit · Nevada Division of Environmental Protection Bureau of Air Pollution Control · AP7374-4749 (FIN A2540) · Under review · ndep.nv.gov ↗
  • Class II Air Quality Operating Permit draft issuance determinationAir permit · Nevada Division of Environmental Protection Bureau of Air Pollution Control · Under review · ndep.nv.gov ↗
  • Public comment period on proposed Class II air permitPublic record · Nevada Division of Environmental Protection Bureau of Air Pollution Control · ndep.nv.gov ↗

What the sources say

  • Size

    “Reported capacity: Planned: 224 MW (source-reported; boundary not independently verified; MW measure not stated by provider)”

    datacenterdata.com ↗ ·

  • Investment

    “Announced investment: $3 billion”

    datacenterdata.com ↗ ·

  • Size

    “Phase I of the campus provides hyperscalers and large cloud providers with 128 MW of combined critical IT capacity across its NV11 and NV12 facilities.”

    consupt.com ↗ ·

  • Acreage

    137 acres

    isadatacentercoming.com ↗ ·

  • Address

    Electric Avenue and USA Parkway, McCarran, Storey County, NV

    ndep.nv.gov ↗ ·

  • Capacity

    224 MW

    isadatacentercoming.com ↗ ·

  • First building opening

    Q2 2026 (NV11)

    isadatacentercoming.com ↗ ·

  • Status

    Under construction

    isadatacentercoming.com ↗ ·

  • Investment

    roughly $3 billion

    isadatacentercoming.com ↗ ·

Reports behind this page

  1. Report from datacenterdata.com · datacenterdata.com ·
  2. Report from aigridwatch.com · aigridwatch.com ·
  3. Report from consupt.com · consupt.com ·
Who is on this job

What the full file adds

  • General contractor1 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioning1 named
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supply1 named
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners4 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Who pays whom2 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Reno and Nevada

Every data center project in Nevada →
Free sample

Get every active project in Nevada.

Tell us what you sell. You get the approved and under-construction projects in Nevada and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.