Switch Citadel Campus (Tahoe Reno)

Data center project in Reno, Nevada

Switch Citadel Campus (Tahoe Reno) is a data center project in Reno, Nevada, under construction, developed by Switch Inc., with a stated size of 2 GW. Last reported September 23, 2026, from 2 sources.

Status
Under construction
Developer
Switch Inc.
Location
Reno, Nevada
Stated size
2 GW
Stated investment
$1.3B
Last reported
·
Sources
2 sources
Other companies on the job
5 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

FAA crane filings

1 filing, 0 of them cranes

up to 130 feet.

1 builder named on the filings, on Ultra.

Permits and filings

  • Special Use Permit 2024-007 (additional building height)Zoning · Storey County Planning Commission / Board of County Commissioners · 2024-007 · Under review · nv-storeycounty.civicplus.com ↗
  • Special Use Permit 2021-23 (120 kV transmission line)Zoning · Storey County Planning Commission · 2021-23 · Under review · storeycounty.org ↗
  • Public Utilities Commission of Nevada permitting / Utility Environmental Protection PermitUtility filing · Public Utilities Commission of Nevada · Status not stated · storeycounty.org ↗

What the sources say

  • Reported

    “Switch is expanding a 2000 MW data center in Storey County, Nevada (expanding).”

    kapwork.com ↗ ·

  • Status

    “Construction start reported - 2020-11”

    kapwork.com ↗ ·

  • Size

    “Reported capacity - 2000 MW”

    kapwork.com ↗ ·

  • Reported

    “The Citadel Campus is the world’s largest Data Center built by Switch Inc. Located in Reno, Nevada, USA, the facility is known as the Tahoe Reno 1.”

    blackridgeresearch.com ↗ ·

  • Status

    “Post 2024 Ongoing construction and expansion to reach the target of 650 MW of power.”

    blackridgeresearch.com ↗ ·

  • Size

    “Total Capacity 650 MW of Power (Once completed)”

    blackridgeresearch.com ↗ ·

  • Investment

    “The total estimated cost for Citadel Data Center is approximately USD 1.3 billion.”

    blackridgeresearch.com ↗ ·

  • Building height

    approximately 120 feet, up to 125 feet with buffer

    nv-storeycounty.civicplus.com ↗ ·

  • Zoning

    I-2 Heavy Industrial

    nv-storeycounty.civicplus.com ↗ ·

  • Capacity

    2000 MW

    kapwork.com ↗ ·

  • Capacity (alternate source)

    650 MW

    servercountry.org ↗ ·

  • Capacity (alternate source)

    130 MW

    prentice.training ↗ ·

  • Building area

    1,300,000 sq ft

    kapwork.com ↗ ·

  • Construction start

    2020-11

    kapwork.com ↗ ·

  • Expected completion

    2024-05

    kapwork.com ↗ ·

  • Permanent jobs

    about 19 full-time workers

    prentice.training ↗ ·

Reports behind this page

  1. Switch: Switch Citadel Campus (Tahoe Reno) data center build in Nevada, 2000 MW | Kapwork · kapwork.com ·
  2. Citadel Data Center: Latest Updates & Expansion (2026) · blackridgeresearch.com ·
Who is on this job

What the full file adds

  • General contractor1 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioning2 named
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • Tenant1 named
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners5 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Reno and Nevada

Every data center project in Nevada →
Free sample

Get every active project in Nevada.

Tell us what you sell. You get the approved and under-construction projects in Nevada and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.