QLevr data center at former Travel Tags site
Data center project in Inver Grove Heights, Minnesota
QLevr data center at former Travel Tags site is a data center project in Inver Grove Heights, Minnesota, approved, developed by QLevr, with a stated size of 5 MW. Last reported September 29, 2026, from 1 source.
- Status
- Approved
- Developer
- QLevr
- Location
- Inver Grove Heights, Minnesota
- Stated size
- 5 MW
- Last reported
- September 29, 2026
- Sources
- 1 source
- Other companies on the job
- None named yet
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“QLevr to build a roughly 54,000-square-foot data center at the former Travel Tags site”
Status
“The Inver Grove Heights City Council approved a site plan for QLevr”
Size
“The facility would begin at 3 megawatts and eventually reach 5 megawatts”
Reports behind this page
- Inver Grove Heights: Contentious data center proposal moves forward · datacentersignal.com, September 29, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partnersEvery company the sources name on this job as they are found, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Inver Grove Heights and Minnesota
- QLevr LLC data center on Carmen Avenue EastApprovedSame townInver Grove HeightsQLevr LLCSize not stated
- T5/QLevr Inver Grove Heights Data CenterBlocked or pausedSame townInver Grove HeightsDeveloper not named5 MW
- T5 Data Center proposal at 5890 Carmen AvenueBlocked or pausedSame townInver Grove HeightsT5 Data CentersSize not stated
- Farmington Technology ParkApprovedFarmingtonTract708 MW
- Meta Rosemount Data CenterUnder constructionRosemountMeta178 MW
- Centra MSP1 Data CenterUnder constructionEaganCentra8 MW
Get every active project in Minnesota.
Tell us what you sell. You get the approved and under-construction projects in Minnesota and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.