ARK1
Data center project in Clarksville, Arkansas
ARK1 is a data center project in Clarksville, Arkansas, under construction, developed by Serverfarm. Last reported October 14, 2026, from 9 sources.
- Status
- Under construction
- Developer
- Serverfarm
- Location
- Clarksville, Arkansas
- Stated size
- Not stated
- Stated investment
- $6.6B
- Last reported
- ·
- Sources
- 9 sources
- Other companies on the job
- 8 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
Permits and filings
- Campus site plan review, first phaseSite plan · Approved · thegraphic.org ↗
- Industrial technology district zoning categoryZoning · Approved · thegraphic.org ↗
- Rezoning of Palmer Road parcels from rural to industrialZoning · Approved · suedatacenters.org ↗
- Minor source air permit for backup generatorsAir permit · Arkansas Department of Energy and Environment, air quality division · Filed · thegraphic.org ↗
- Stormwater Pollution Prevention Plan (SWPPP)Environmental review · Arkansas Department of Energy and Environment · Approved · thegraphic.org ↗
- Transmission service agreement term sheetUtility filing · Approved · thegraphic.org ↗
- Electric Service Agreement with ServerfarmUtility filing · Under review · thegraphic.org ↗
- Industrial development revenue bonds and PILOT agreementsIncentive · nearbydatacenters.org ↗
What the sources say
Reported
“The two-story ARK1 facility will offer 108MW of capacity across 300,000 sq ft (27,870 sqm).”
Reported
“The two-story ARK1 facility is designed to deliver 108MW of capacity across 300,000 square feet”
Reported
“The two-story ARK1 is set to offer 108MW of capacity across 300,000 sq ft (27,870 sqm).”
Status
“Serverfarm has topped out the first building”
Acreage
135 acres
Building area
300,000 sq ft, 2 floors
Power capacity
432 MW planned
Emergency generators
18 generators totaling approximately 55.2 MW
Cooling
Closed loop
Completion
first two buildings by January 2028
Indirect regional jobs
150 to 400
Site location
off Arkansas Highway 123
Investment
$6.6 billion
Reports behind this page
- Serverfarm Completes Structure of First Data Center at Arkansas Campus · baxtel.com ·
- Serverfarm Tops Out First Data Center Building at Arkansas Campus · idcnova.com ·
- Serverfarm tops out first data center at Arkansas campus · datacenterdynamics.com ·
- Serverfarm Tops Out First 108MW Building at $6.6B Arkansas Campus · baxtel.com ·
What the full file adds
- General contractor3 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply1 named
- Tenant1 named
- Investors and lenders2 named
- Named builders, suppliers and partners8 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom7 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Clarksville and Arkansas
- Serverfarm ARK Clarksville Data Center CampusUnder constructionSame town · ClarksvilleServerfarm432 MW
- Steel River Energy CenterUnder construction · Town not statedCypress Creek Energy2.5 GW
- Arkansas Cypress Solar and BatteryUnder construction · Pine BluffEntergy Arkansas600 MW
- Google West Memphis Data Center CampusUnder construction · West MemphisGoogle600 MW
- Big Island solar farmUnder construction · Town not statedDeveloper not named440 MW
- Big Island solar plantUnder construction · Town not statedPattern EnergySize not stated
Get every active project in Arkansas.
Tell us what you sell. You get the approved and under-construction projects in Arkansas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.