Google West Memphis Data Center Campus
Data center project in West Memphis, Arkansas
Google West Memphis Data Center Campus is a data center project in West Memphis, Arkansas, under construction, developed by Google, with a stated size of 600 MW. Last reported October 25, 2026, from 18 sources.
- Status
- Under construction
- Developer
- Location
- West Memphis, Arkansas
- Stated size
- 600 MW
- Stated investment
- $4B
- Last reported
- October 25, 2026
- Sources
- 18 sources
- Other companies on the job
- 6 companies named, on Ultra
Is it moving?
Permits and filings
- Utility filingUtility filing · Status not stateddatacenterrecord.org ↗
- Staff memo on site maximum power demandUtility filing · Filedisadatacentercoming.com ↗
- U.S. Army Corps of Engineers filing for campus footprintEnvironmental review · U.S. Army Corps of Engineers · Status not statedsuedatacenters.org ↗
- Payment-In-Lieu-Of-Taxes (PILOT), personal property tax abatementIncentive · Approvedsuedatacenters.org ↗
- IncentiveIncentive · Act 548 · Approvedsuedatacenters.org ↗
What the sources say
Status
“which remained under construction with an expected 18-24 month build timeline”
Acreage
1,178 acres
Core campus acreage
580 acres
Building area
900,000 sq ft
Maximum power demand
up to 600 megawatts
Substation
major utility substation
Companion solar and battery
600 MW solar with 350 MW battery storage
Cooling
Closed loop
Water use
Graywater plant planned
Construction start
October 2025
Completion
2027
Reports behind this page
- Report from datacenterdynamics.com · datacenterdynamics.com, October 19, 2026
- Report from pacificsoftwareventures.com · pacificsoftwareventures.com, October 19, 2026
- Report from aigridwatch.com · aigridwatch.com, October 11, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply4 named
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners6 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom24 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in West Memphis and Arkansas
- Galet 500/230 kV substationUnder constructionSame townWest MemphisDeveloper not namedSize not stated
- Google's West Memphis data centerAnnouncedSame townWest MemphisDeveloper not named600 MW
- Galet Substation ExpansionAnnouncedSame townWest MemphisEntergy ArkansasSize not stated
- Google data center campus in West MemphisAnnouncedSame townWest MemphisGoogleSize not stated
- Google West Memphis AI data center campusAnnouncedSame townWest MemphisGoogleSize not stated
- Google West Memphis Data Center Campus Expansion and Energy Infrastructure ProgrammeAnnouncedSame townWest MemphisGoogleSize not stated
Get every active project in Arkansas.
Tell us what you sell. You get the approved and under-construction projects in Arkansas and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.