Skip to content

Moses Lake AI/HPC data center

Data center project in Moses Lake, Washington

Moses Lake AI/HPC data center is a data center project in Moses Lake, Washington, under construction, developed by Keel Infrastructure, with a stated size of 18 MW. Last reported August 24, 2026, from 1 source.

Status
Under construction
Developer
Keel Infrastructure
Location
Moses Lake, Washington
Stated size
18 MW
Stated investment
$129M
Last reported
·
Sources
1 source
Other companies on the job
4 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.

What the sources say

  • Reported

    “Moses Lake: From Bitcoin to AI and HPC Moses Lake, Washington, may be one of the more revealing data center stories of the AI buildout right now.”

    linkedin.com ↗ ·

  • Status

    “with the old mining structure demolished, construction underway, long-lead equipment arriving and commissioning targeted for 2027”

    linkedin.com ↗ ·

  • Size

    “Keel Infrastructure, formerly Bitfarms, is taking an 18-MW Bitcoin mining site and rebuilding it as an AI/HPC data center”

    linkedin.com ↗ ·

  • Investment

    “Keel has committed roughly $129 million for a fully integrated hybrid-built facility”

    linkedin.com ↗ ·

Reports behind this page

  1. Repurposing Power for AI and HPC | Rackvio 发布的此话题相关的动态 | 领英 - Repurposing Power for AI and HPC · linkedin.com ·
Who is on this job

What the full file adds

  • General contractor1 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioning1 named
  • Power and cooling equipment1 named
  • Utility and power supply1 named
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners4 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Moses Lake and Washington

Every data center project in Washington →
Free sample

Get every active project in Washington.

Tell us what you sell. You get the approved and under-construction projects in Washington and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.