Applied Digital AI data center campus in Ellendale

Data center project in Ellendale, North Dakota

Applied Digital AI data center campus in Ellendale is a data center project in Ellendale, North Dakota, under construction, developed by Applied Digital, with a stated size of 100 MW. Last reported June 3, 2026, from 2 sources.

Status
Under construction
Developer
Applied Digital
Location
Ellendale, North Dakota
Stated size
100 MW
Last reported
·
Sources
2 sources
Other companies on the job
2 companies named, on Ultra
Public records

Is it moving?

Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work

Permits and filings

  • Rezoning of Section 24 from agricultural to industrialZoning · Oliver County Commission · centralnordak.com ↗
  • County Commission approval of site planSite plan · Oliver County Commission · Status not stated · centralnordak.com ↗
  • Final building permit approvalBuilding permit · Oliver County Commission · Status not stated · centralnordak.com ↗
  • Sound study for noise-producing equipmentEnvironmental review · Oliver County Commission · Status not stated · centralnordak.com ↗
  • Agreement with county highway department on access roads and turning lanesTraffic study · Oliver County Commission · Status not stated · centralnordak.com ↗
  • Agreement on offsite water for cooling system and no aquifer injectionWater · Oliver County Commission · Status not stated · centralnordak.com ↗
  • Applied Digital Man Camp - Ellendale, ND (Public Convenience & Necessity, Electric)Utility filing · North Dakota State Public Service Commission · PU-26-173 · apps.psc.nd.gov ↗
  • Petition to annex property into EllendalePublic record · City of Ellendale · Filed · wp.m.bing.com ↗

What the sources say

  • Reported

    “Applied Digital’s Ellendale site is undergoing an expansion into an AI data center, called Polaris Forge I.”

    local.newsbreak.com ↗ ·

  • Main building square footage

    Approximately 907,000 square feet (about 20 acres)

    centralnordak.com ↗ ·

  • Rezoned parcel

    All of Section 24, Township 142 North, Range 85 West

    centralnordak.com ↗ ·

  • Stormwater ponds

    Ponds for retention and detention of roof run-off

    centralnordak.com ↗ ·

  • Construction duration

    18 to 24 months overall

    centralnordak.com ↗ ·

  • First building completion

    12 to 14 months

    centralnordak.com ↗ ·

  • Full-time jobs

    200 full-time jobs, around 80 percent trade jobs

    centralnordak.com ↗ ·

  • Shifts

    Three shifts of roughly 60 to 65 employees per shift, 24/7

    centralnordak.com ↗ ·

  • Cooling water source

    Initial water brought from offsite

    centralnordak.com ↗ ·

  • Fire prevention

    Advanced Vesta Systems

    centralnordak.com ↗ ·

  • Existing Ellendale facility

    180 megawatt cryptocurrency optimized data center

    ndpublicnotices.newzgroup.com ↗ ·

Reports behind this page

  1. Data center developer looks west, backs power upgrades near Fargo - NewsBreak - 2K · local.newsbreak.com ·
Who is on this job

What the full file adds

  • General contractor2 named
  • Electrical contractorOpen: not named yet
  • Mechanical contractorOpen: not named yet
  • Engineering and commissioningOpen: not named yet
  • Power and cooling equipmentOpen: not named yet
  • Utility and power supplyOpen: not named yet
  • TenantOpen: not named yet
  • Investors and lendersOpen: not named yet
  • Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
  • Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
  • ContactsSenior people at the companies on this job, where public pages name them.Ultra
  • Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
  • Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
  • AlertsAn email the day this project moves.Ultra

A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.

What Ultra opens on every project

  • Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
  • Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
  • Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
  • Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
  • Found money, and who pays. Found money, Who funds the build-out.
  • Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
  • Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Everything Ultra includes, feature by feature →

Other data centers in Ellendale and North Dakota

Every data center project in North Dakota →
Free sample

Get every active project in North Dakota.

Tell us what you sell. You get the approved and under-construction projects in North Dakota and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.

Free, and the sample downloads right away. We use your details only to send the sample and talk about your work. See the privacy policy.