Switch Tahoe Reno 4 (The Citadel Campus)
Data center project in McCarran, Nevada
Switch Tahoe Reno 4 (The Citadel Campus) is a data center project in McCarran, Nevada, operating. Last reported October 13, 2026, from 1 source.
- Status
- Operational
- Developer
- Not named in the sources
- Location
- McCarran, Nevada
- Stated size
- Not stated
- Last reported
- October 13, 2026
- Sources
- 1 source
- Other companies on the job
- 1 company named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“Switch Tahoe Reno 4 (The Citadel Campus) is an operating data center in McCarran, Nevada (Storey County), operated by Switch.”
Status
“Baxtel lists Citadel Campus Building 4 as fully operational, built 2026.”
Reports behind this page
- Switch Tahoe Reno 4 (The Citadel Campus), McCarran, NV · suedatacenters.org, October 13, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in McCarran and Nevada
- Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)Under constructionSame townMcCarranFleet Data Centers400 MW
- Fleet / Tract data center off USA Parkway (South Valley)Under constructionSame townMcCarranTract230 MW
- Switch Tahoe Reno 1 (The Citadel Campus)OperationalSame townMcCarranSwitch650 MW
- Switch CITADEL CampusUnknownSame townMcCarranSwitch650 MW
- Switch Tahoe Reno 3 (The Citadel Campus)OperationalSame townMcCarranSwitchSize not stated
- Confidential Data Center Phase 1UnknownSame townMcCarranDeveloper not namedSize not stated
Get every active project in Nevada.
Tell us what you sell. You get the approved and under-construction projects in Nevada and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.