Switch Tahoe Reno 3 (The Citadel Campus)
Data center project in McCarran, Nevada
Switch Tahoe Reno 3 (The Citadel Campus) is a data center project in McCarran, Nevada, operating, developed by Switch. Last reported July 23, 2026, from 1 source.
- Status
- Operational
- Developer
- Switch
- Location
- McCarran, Nevada
- Stated size
- Not stated
- Last reported
- July 23, 2026
- Sources
- 1 source
- Other companies on the job
- 2 companies named, on Ultra
Public records
Is it moving?
FAA crane filings
1 filing, 1 with work scheduled now
Latest work from May 19, 2026 to November 19, 2027, up to 365 feet.
- Mobile crane 2026-AWP-5224-OE ↗ · May 19, 2026 to November 19, 2027
What the sources say
Reported
“Switch Tahoe Reno 3 (The Citadel Campus)”
Status
“Source-reported status - operational”
Reports behind this page
- Switch Tahoe Reno 3 (The Citadel Campus) — licensed source row | DataCenterData · datacenterdata.com, July 23, 2026
Who is on this job
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply2 named
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners2 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
Other data centers in McCarran and Nevada
- Fleet Data Centers Storey County Campus (South Valley & Peru Ridge)Under constructionSame townMcCarranFleet Data Centers400 MW
- Fleet / Tract data center off USA Parkway (South Valley)Under constructionSame townMcCarranTract230 MW
- Switch Tahoe Reno 1 (The Citadel Campus)OperationalSame townMcCarranSwitch650 MW
- Switch CITADEL CampusUnknownSame townMcCarranSwitch650 MW
- Switch Tahoe Reno 4 (The Citadel Campus)OperationalSame townMcCarranDeveloper not namedSize not stated
- Confidential Data Center Phase 1UnknownSame townMcCarranDeveloper not namedSize not stated
Free sample
Get every active project in Nevada.
Tell us what you sell. You get the approved and under-construction projects in Nevada and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.