Patmos data center at 1601 McGee
Data center project in Kansas City, Missouri
Patmos data center at 1601 McGee is a data center project in Kansas City, Missouri, under construction, developed by Patmos. Last reported January 14, 2026, from 1 source.
- Status
- Under construction
- Developer
- Patmos
- Location
- Kansas City, Missouri
- Stated size
- Not stated
- Stated investment
- $1B
- Last reported
- January 14, 2026
- Sources
- 1 source
- Other companies on the job
- 1 company named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“The green glass building at 1601 McGee towers over the Crossroads.”
Status
“Kansas City-based Patmos is undergoing a $1 billion retrofit of the 400,000-square-foot structure”
Reports behind this page
- Kansas City data center gets one of nation's first clean energy loans · kbia.org, January 14, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lenders1 named
- Named builders, suppliers and partners1 company named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom2 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Kansas City and Missouri
- KNC Confidential Data CenterUnder constructionSame townKansas CityDeveloper not named80 MW
- Patmos AI CampusUnder constructionSame townKansas CityPatmos Holdings Inc.35 MW
- NRD Confidential Data CenterUnder constructionSame townKansas CityDeveloper not namedSize not stated
- Patmos Kansas City AI campus (former Kansas City Star building)Under constructionSame townKansas CityPatmos HostingSize not stated
- Project MicaUnder constructionSame townKansas CityGoogleSize not stated
- Meta Kansas City Data CenterOperationalSame townKansas CityMetaSize not stated
Get every active project in Missouri.
Tell us what you sell. You get the approved and under-construction projects in Missouri and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.