N2W campus
Data center project in St. Louis, Missouri
N2W campus is a data center project in St. Louis, Missouri, operating. Last reported March 26, 2026, from 1 source.
- Status
- Operational
- Developer
- Not named in the sources
- Location
- St. Louis, Missouri
- Stated size
- Not stated
- Stated investment
- $1.7B
- Last reported
- March 26, 2026
- Sources
- 1 source
- Other companies on the job
- 5 companies named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“The National Geospatial-Intelligence Agency (NGA) has opened its new, $1.7 billion campus in St. Louis”
Reports behind this page
- Missouri Archives · rebusinessonline.com, March 26, 2026
What the full file adds
- General contractor3 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioning1 named
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners5 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Missouri
- Nebius data centerUnder constructionIndependenceNebius Group, N.V.1.2 GW
- Festus Data Center CampusApprovedFestusCRG600 MW
- KNC Confidential Data CenterUnder constructionKansas CityDeveloper not named80 MW
- Patmos AI CampusUnder constructionKansas CityPatmos Holdings Inc.35 MW
- Amazon data center project outside New FlorenceUnder constructionNew FlorenceAmazonSize not stated
- Golden Plains Technology ParkUnder constructionTown not statedDiode VenturesSize not stated
Get every active project in Missouri.
Tell us what you sell. You get the approved and under-construction projects in Missouri and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.