National Center for Critical Information Processing And Storage (NCCIPS)
Data center project in Stennis Space Center, Mississippi
National Center for Critical Information Processing And Storage (NCCIPS) is a data center project in Stennis Space Center, Mississippi, operating. Last reported July 27, 2026, from 1 source.
- Status
- Operational
- Developer
- Not named in the sources
- Location
- Stennis Space Center, Mississippi
- Stated size
- Not stated
- Stated investment
- $130M
- Last reported
- July 27, 2026
- Sources
- 1 source
- Other companies on the job
- 5 companies named, on Ultra
Is it moving?
No FAA crane filing, EPA permit or public filing is matched to this project yet. Records are matched only when they name the project, its owner or its builder, so this page shows nothing rather than a neighbor's crane. They are checked again every week.
What the sources say
Reported
“National Center for Critical Information Processing And Storage (NCCIPS). Includes operating, maintaining, and managing the NCCIPS facility and campus at NASA stennis space center”
Status
“Includes operating, maintaining, and managing the NCCIPS facility and campus at NASA stennis space center”
Investment
“worth up to $130,488,563 by Shared Services Center in October 2019”
Reports behind this page
- NCCIPS Data Center Ops Management Support (80NSSC19C0050) · gdicaptureedge.highergov.com, July 27, 2026
What the full file adds
- General contractorOpen: not named yet
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supplyOpen: not named yet
- TenantOpen: not named yet
- Investors and lendersOpen: not named yet
- Named builders, suppliers and partners5 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom5 deals on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Mississippi
- MACROHARDRRUnder constructionSouthavenxAI2 GW
- AWS Project Atlas – Madison County Mega Site (Canton)Under constructionRidgelandAmazon Web Services1 GW
- Meridian Compass Data CenterUnder constructionMeridianCompass Datacenters500 MW
- Taurus Data Center HubUnder constructionBrandonAVAIO Digital Partners450 MW
- Big Island SolarUnder constructionTown not statedPattern Energy440 MW
- Big Island solar facilityUnder constructionTown not statedDeveloper not named440 MW
Get every active project in Mississippi.
Tell us what you sell. You get the approved and under-construction projects in Mississippi and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.