QTS Cedar Rapids Data Center Campus
Data center project in Cedar Rapids, Iowa
QTS Cedar Rapids Data Center Campus is a data center project in Cedar Rapids, Iowa, approved, developed by QTS. Last reported October 31, 2026, from 3 sources.
- Status
- Approved
- Developer
- QTS
- Location
- Cedar Rapids, Iowa
- Stated size
- Not stated
- Stated investment
- $10B
- Last reported
- ·
- Sources
- 3 sources
- Other companies on the job
- 7 companies named, on Ultra
Is it moving?
Every record shows two dates: the one the source gives, and the day Spezia last checked it. How the dates work
FAA crane filings
6 filings, 5 with work scheduled now
Latest work from April 20, 2026 to May 27, 2027, up to 190 feet.
- Mobile crane 2026-ACE-1734-OE ↗ · work April 20, 2026 to April 30, 2027 ·
- Mobile crane 2026-ACE-921-OE ↗ · work April 20, 2026 to November 27, 2026 ·
- Mobile crane 2026-ACE-389-OE ↗ · work February 16, 2026 to May 27, 2027 ·
- Mobile crane 2025-ACE-5540-OE ↗ · work January 15, 2026 to December 14, 2026 ·
- Mobile crane 2025-ACE-5541-OE ↗ · work January 1, 2026 to November 30, 2026 ·
3 builders named on the filings, on Ultra.
What the full file adds
- General contractor3 named
- Electrical contractorOpen: not named yet
- Mechanical contractorOpen: not named yet
- Engineering and commissioningOpen: not named yet
- Power and cooling equipmentOpen: not named yet
- Utility and power supply1 named
- TenantOpen: not named yet
- Investors and lenders1 named
- Named builders, suppliers and partners7 companies named on this job besides the developer, each with its source.Ultra
- Buying stage by tradeWhen the electrical, mechanical and other trade work on this job is likely to be bought.Ultra
- ContactsSenior people at the companies on this job, where public pages name them.Ultra
- Who pays whom1 deal on file: equity, loans, leases, power or equipment, each with its source.Ultra
- Video and satellite readingsHow busy the site looks, wherever public drone or news footage or a satellite image of it is found.Ultra
- Spezia's read of the projectIts construction phase, how likely it is to be built and what is holding it back.Ultra
- AlertsAn email the day this project moves.Ultra
A free account opens every project file 3 days a month. Ultra opens it every day, $299 a month.
What Ultra opens on every project
- Find the jobs worth a call. Build-out overview, Projects list and filters, Your territory, Data center map, Demand by quarter, Geography, Trends.
- Know who to call, and when. Project file, Buying stage and contacts, Company dossiers and directory, Ecosystem.
- Prove a project is real and moving. Readiness signs, Project file filings, FAA crane filings, EPA air and stormwater permits, Site videos, Satellite readings, Laws and local rules.
- Power and the grid. On-site power plants, Planned power plants, Grid connection queues, Power gap by state.
- Found money, and who pays. Found money, Who funds the build-out.
- Get the data into your tools. Excel and CSV downloads, REST API, Data center tools in your AI agent.
- Stay on top of it. What changed, Build-out news, Project Watch and the weekly roundup, Same-day watch alerts.
Other data centers in Cedar Rapids and Iowa
- Google Cedar Rapids Data Center CampusApprovedSame town · Cedar RapidsGoogle82 MW
- Cedar Rapids, Iowa data centerUnknownSame town · Cedar RapidsDeveloper not namedSize not stated
- QTS DC3 Data CenterUnknownSame town · Cedar RapidsQTSSize not stated
- Project LolaUnder construction · Council BluffsEdged200 MW
- Meta Altoona Data Center CampusOperational · AltoonaMeta350 MW
- Oppidan Data CenterOperational · Des MoinesOppidan5 MW
Get every active project in Iowa.
Tell us what you sell. You get the approved and under-construction projects in Iowa and the states you add, with their stage and size, and a short walkthrough of the full files if it fits. No card.